{"id":113172,"date":"2026-11-22T11:48:14","date_gmt":"2026-11-22T08:48:14","guid":{"rendered":"https:\/\/amlak.net.sa\/?p=113172"},"modified":"2026-11-22T11:48:16","modified_gmt":"2026-11-22T08:48:16","slug":"%d8%a5%d8%af%d8%a7%d8%b1%d8%a9-%d9%85%d8%ae%d9%84%d9%81%d8%a7%d8%aa-%d8%a7%d9%84%d8%a8%d9%86%d8%a7%d8%a1-%d9%88%d8%a7%d9%84%d9%87%d8%af%d9%85-%d8%ad%d9%84%d9%88%d9%84-%d9%84%d8%aa%d9%82%d9%84%d9%8a","status":"publish","type":"post","link":"https:\/\/amlak.net.sa\/en\/113172\/","title":{"rendered":"Construction and demolition waste management: Solutions to reduce real estate project costs"},"content":{"rendered":"<div class=\"translation-block\">\n<p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\">The cost of a real estate project does not stop at purchasing the land or executing the structural framework and finishing works. Construction and demolition waste is one of the issues that may turn into additional burdens on the owner and contractor if it is not managed from the design stage through execution and demolition. Between the accumulation of rubble, transportation and disposal costs, and the waste of reusable materials, waste management stands out as part of the project&#039;s efficiency, not just an environmental or regulatory procedure.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> In Saudi Arabia, the management of construction and demolition waste is organized within a system that aims to reduce waste production, promote sorting at the source, reuse and recycle it, and direct what cannot be treated to safe disposal, thereby reducing waste and enhancing the efficiency of resource use in the construction sector.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> In this context, <strong><a href=\"https:\/\/istitlaa.scbc.gov.sa\/ar\/Civil\/ncwm\/TechnicalGuidelinesConstructionandDemolitionWasteM\/Pages\/default.aspx?utm_source=chatgpt.com\"><mark class=\"has-inline-color has-accent-color\">the National Waste Management Center \u201cMawan\u201d defines, through its controls and technical guidelines for managing construction and demolition waste<\/mark><\/a><\/strong> , a set of principles that regulate dealing with waste through the stages of planning, separation, collection, transportation, treatment, reuse, recycling and safe disposal, in accordance with the waste management system and its executive regulations.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>What are the wastes from construction and demolition?<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Construction and demolition waste includes materials resulting from the construction of buildings and infrastructure, or renovation, maintenance, rehabilitation and demolition work, and includes concrete, bricks, tiles, metals, wood and plastics, in addition to soil and other materials that vary according to the nature of the project.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> These materials are not equal in value or how they are handled. Some can be reused directly, while others need to be processed or recycled. Contaminated or hazardous materials require special procedures. The problem is that mixing different materials from the beginning of the project may reduce the chances of benefiting from them and increase the cost of sorting, transportation, and processing. This makes early separation one of the most important solutions to reduce waste.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Early planning reduces waste before it appears<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Waste management begins at the design stage, not after the debris appears on site. The engineering office and contractor can estimate the quantities of materials expected to be consumed and the resulting waste, identify materials that can be reused, and plan storage and separation sites, thus reducing mixing and limiting losses.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Planning also includes reviewing the required quantities of materials, coordinating supply processes, avoiding purchasing quantities exceeding the project&#039;s needs, and making arrangements with suppliers regarding unused materials when agreements allow, thereby reducing waste resulting from poor planning or over-supply.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Sorting waste at the source: a step to reduce transportation and processing costs.<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Sorting waste at the source is one of the most effective solutions for reducing debris management costs. Therefore, it is advisable to allocate separate areas or containers on-site according to material type, rather than collecting all materials in a single container. This procedure allows for the separation of concrete and rubble from bricks and tiles, the recovery of iron and other metals, and the collection of wood, plastics, and packaging materials in a way that facilitates their reuse or disposal at recycling facilities.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Early separation helps improve the chances of utilizing recovered materials, reduces contamination of recyclable materials, and makes transportation and processing more efficient, especially in projects that produce large quantities of waste.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The technical evidence published by <strong><a href=\"https:\/\/istitlaa.scbc.gov.sa\/ar\/Civil\/ncwm\/TechnicalGuidelinesConstructionandDemolitionWasteM\/Pages\/default.aspx?utm\"><mark class=\"has-inline-color has-accent-color\">the National Waste Management Center<\/mark><\/a><\/strong> confirms the importance of managing waste in a sequence that prioritizes reducing its production, reusing it, sorting it, and treating it, before resorting to its final disposal.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Reusing materials instead of disposing of them<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The solution is not limited to sorting, but extends to reusing materials instead of disposing of them, as some materials resulting from construction or demolition work can be used by the same projects, according to technical specifications and safety requirements, or transferred to other projects if they meet regulatory conditions.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Opportunities for reuse include some excavation materials, architectural elements that can be dismantled and recovered, paving materials, and some finishing components, depending on their condition and potential for use. These practices provide an opportunity to reduce reliance on new materials and lower the amount of waste that needs to be transported or processed, taking into account the engineering and technical requirements of each use.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Recycling of concrete and construction materials<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Concrete is one of the most prominent materials resulting from construction and demolition projects. In some cases, concrete can be processed, crushed, and converted into recycled materials or aggregates, according to technical specifications and final use. Iron, metals, and other materials can also be recovered and sent to specialized facilities instead of being disposed of as mixed waste.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The feasibility of recycling depends on the type and condition of the material, the availability of suitable processing facilities, transportation costs, and end-use requirements, which necessitates studying the available options for the project before making a decision.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> These practices fall within the circular economy trends in the construction sector, which are based on preserving the value of materials for as long as possible, reducing the consumption of new resources, and converting part of the waste into materials that can be used in other applications, instead of treating it as a burden that must be disposed of.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Transporting construction waste to approved sites<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Waste management is not limited to collecting waste from the site, but also requires ensuring that it is transported to designated and approved destinations, and dealing with qualified and licensed service providers in accordance with regulations.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> <strong><a href=\"https:\/\/momah.gov.sa\/en\/node\/14633?utm\"><mark class=\"has-inline-color has-accent-color\">The Ministry of Municipalities and Housing clarifies, within the requirements for disposing of construction, demolition and restoration waste,<\/mark><\/a><\/strong> the requirements for dealing with the waste from these activities, the importance of adhering to the specified disposal mechanisms and transporting the waste to designated sites, in addition to the responsibilities of the parties related to the project.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The waste management system also regulates the activities of collection, transportation, storage, treatment, recycling and safe disposal, and requires obtaining the necessary licenses or permits to practice the activities that require it, in order to ensure the organization of the chain of dealing with waste and not leaving it or disposing of it in irregular ways.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>What obligations should the project owner and contractor be aware of?<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The requirements for disposing of construction, demolition and restoration waste are linked to the stages of issuing building, demolition and restoration permits, and define the responsibilities of the concerned parties, including the project owner, the engineering office, the contractor and the transporter, according to the applicable requirements.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The project owner is responsible for ensuring compliance with waste management requirements and contracting with a licensed carrier, while the engineering office is responsible for estimating the expected quantities of waste and including the required data within the licensing procedures according to the requirements. The contractor is responsible for organizing the waste within the site, sorting it, not mixing materials that can be used, and adhering to the mechanisms of transport and disposal, while the carrier is responsible for transporting the waste to the specified sites and adhering to the regulatory requirements related to transport.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Service providers for processing and recycling must also conduct their activities in accordance with the necessary licenses and permits, within the framework of the system that regulates the handling of waste at its various stages.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The waste management system prohibits leaving, dumping, burying, or burning waste in places other than those designated, and sets controls for dealing with it in a way that ensures the protection of the environment and public health.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Saudi Arabia aims to divert 891 TP3T of construction and demolition waste from landfills by 2040<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> As part of the development of the waste management system in Saudi Arabia, the comprehensive national solution for managing construction and demolition waste includes targets extending to 2040, which include reducing waste production and promoting sorting, reuse and recycling.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> According to the regulations and technical guidelines published by the National Center for Waste Management, the system aims to reduce the production of construction and demolition waste from 92.5 kilograms per square meter of construction to 83.2 kilograms, sort 99% of waste at the source, divert 89% of it from landfills, in addition to preparing 89% of waste for recycling by 2040.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The phased targets include gradually increasing the rates of diverting construction and demolition waste from landfills, to reach 18% in 2026, 53% in 2030, and 89% in 2040, according to the table in the technical guides for the waste disposal system. These targets reflect a trend towards enhancing the utilization of resources and reducing reliance on final disposal.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> <strong>Read also:<\/strong><\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> <strong><a href=\"https:\/\/amlak.net.sa\/en\/113046\/\" data-type=\"link\" data-id=\"https:\/\/amlak.net.sa\/113046\/\">Accredited laboratories: The first line of defense for ensuring the quality of building products and protecting real estate.<\/a><\/strong><\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"><\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading time: <\/span> <span class=\"rt-time\"> 4<\/span> <span class=\"rt-label rt-postfix\">Minutes<\/span><\/span>How to reduce construction and demolition waste and real estate project costs? Learn about the steps for sorting, reuse and recycling, Saudi requirements, and waste management targets up to 2040.<\/p>","protected":false},"author":84,"featured_media":113173,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"\u0625\u062f\u0627\u0631\u0629 \u0645\u062e\u0644\u0641\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621 \u0648\u0627\u0644\u0647\u062f\u0645.. \u062d\u0644\u0648\u0644 \u0644\u062a\u0642\u0644\u064a\u0644 \u062a\u0643\u0627\u0644\u064a\u0641 \u0627\u0644\u0645\u0634\u0627\u0631\u064a\u0639 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u0629","_seopress_titles_desc":"\u0643\u064a\u0641 \u062a\u0642\u0644\u0644 \u0645\u062e\u0644\u0641\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621 \u0648\u0627\u0644\u0647\u062f\u0645 \u0648\u062a\u0643\u0627\u0644\u064a\u0641 \u0627\u0644\u0645\u0634\u0631\u0648\u0639 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u061f \u062a\u0639\u0631\u0641 \u0639\u0644\u0649 \u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0641\u0631\u0632 \u0648\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u0644\u062a\u062f\u0648\u064a\u0631\u060c \u0648\u0627\u0644\u0627\u0634\u062a\u0631\u0627\u0637\u0627\u062a \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629\u060c \u0648\u0645\u0633\u062a\u0647\u062f\u0641\u0627\u062a \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0646\u0641\u0627\u064a\u0627\u062a \u062d\u062a\u0649 2040.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"amlak_video_sent":"","footnotes":""},"categories":[123],"tags":[11165,11169,11167,11168,11163,11164,11170,11166],"class_list":["post-113172","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-building-materials-techniques","tag-11165","tag-11169","tag-11167","tag-11168","tag-11163","tag-11164","tag-11170","tag-11166"],"acf":{"amlak_post_excerpt":"\u0643\u064a\u0641 \u062a\u0642\u0644\u0644 \u0645\u062e\u0644\u0641\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621 \u0648\u0627\u0644\u0647\u062f\u0645 \u0648\u062a\u0643\u0627\u0644\u064a\u0641 \u0627\u0644\u0645\u0634\u0631\u0648\u0639 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u061f \u062a\u0639\u0631\u0641 \u0639\u0644\u0649 \u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0641\u0631\u0632 \u0648\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u0644\u062a\u062f\u0648\u064a\u0631\u060c \u0648\u0627\u0644\u0627\u0634\u062a\u0631\u0627\u0637\u0627\u062a \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629\u060c \u0648\u0645\u0633\u062a\u0647\u062f\u0641\u0627\u062a \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0646\u0641\u0627\u064a\u0627\u062a \u062d\u062a\u0649 2040.","amlak_post_excerpt_source":{"label":"Amlak post excerpt","type":"text","formatted_value":"\u0643\u064a\u0641 \u062a\u0642\u0644\u0644 \u0645\u062e\u0644\u0641\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621 \u0648\u0627\u0644\u0647\u062f\u0645 \u0648\u062a\u0643\u0627\u0644\u064a\u0641 \u0627\u0644\u0645\u0634\u0631\u0648\u0639 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u061f \u062a\u0639\u0631\u0641 \u0639\u0644\u0649 \u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0641\u0631\u0632 \u0648\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u0644\u062a\u062f\u0648\u064a\u0631\u060c \u0648\u0627\u0644\u0627\u0634\u062a\u0631\u0627\u0637\u0627\u062a \u0627\u0644\u0633\u0639\u0648\u062f\u064a\u0629\u060c \u0648\u0645\u0633\u062a\u0647\u062f\u0641\u0627\u062a \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0646\u0641\u0627\u064a\u0627\u062a \u062d\u062a\u0649 2040."}},"featured_image_urls":{"full":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_waste_web_enhanced.jpg",1280,811,false],"thumbnail":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_waste_web_enhanced-150x150.jpg",150,150,true],"medium":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_waste_web_enhanced-300x190.jpg",300,190,true],"medium_large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_waste_web_enhanced-768x487.jpg",768,487,true],"large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_waste_web_enhanced-1024x649.jpg",1024,649,true],"1536x1536":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_waste_web_enhanced.jpg",1280,811,false],"2048x2048":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_waste_web_enhanced.jpg",1280,811,false],"trp-custom-language-flag":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_waste_web_enhanced-18x12.jpg",18,12,true],"event-thumbnail":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_waste_web_enhanced-300x200.jpg",300,200,true],"event-medium":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_waste_web_enhanced-600x400.jpg",600,400,true],"event-large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_waste_web_enhanced-1200x800.jpg",1200,800,true],"event-hero":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_waste_web_enhanced.jpg",1280,811,false]},"author_info":{"info":["\u0635\u062d\u064a\u0641\u0629 \u0623\u0645\u0644\u0627\u0643"]},"category_info":"<a href=\"https:\/\/amlak.net.sa\/en\/category\/development-construction\/building-materials-techniques\/\" rel=\"category tag\">\u0645\u0648\u0627\u062f \u0648\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621<\/a>","tag_info":"\u0645\u0648\u0627\u062f \u0648\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621","comment_count":"0","_links":{"self":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/113172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/comments?post=113172"}],"version-history":[{"count":1,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/113172\/revisions"}],"predecessor-version":[{"id":113174,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/113172\/revisions\/113174"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media\/113173"}],"wp:attachment":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media?parent=113172"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/categories?post=113172"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/tags?post=113172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}