{"id":113223,"date":"2026-11-23T12:19:54","date_gmt":"2026-11-23T09:19:54","guid":{"rendered":"https:\/\/amlak.net.sa\/?p=113223"},"modified":"2026-11-23T12:19:57","modified_gmt":"2026-11-23T09:19:57","slug":"%d8%a7%d9%84%d8%a8%d9%86%d8%a7%d8%a1-%d8%ae%d8%a7%d8%b1%d8%ac-%d8%a7%d9%84%d9%85%d9%88%d9%82%d8%b9-%d9%87%d9%84-%d8%aa%d9%86%d9%82%d9%84-%d8%a7%d9%84%d9%85%d8%b5%d8%a7%d9%86%d8%b9-%d9%85%d8%b3%d8%aa","status":"publish","type":"post","link":"https:\/\/amlak.net.sa\/en\/113223\/","title":{"rendered":"Off-site construction: Will factories take the future of contracting to a new stage?"},"content":{"rendered":"<div class=\"translation-block\">\n<p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\">The construction sector is witnessing a major development, as construction is no longer necessarily linked to traditional methods that rely on carrying out all stages of construction on-site, from pouring concrete to installing walls and finishing. The construction industry is expanding to adopt solutions that rely on manufacturing building parts off-site, then transporting and installing them on the final site, in a transformation that opens the door to reducing the execution time, improving the quality of some work, and reducing waste. However, it raises questions about the cost, design flexibility, and its suitability for residential projects in Saudi Arabia.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> This trend is known as modular construction and prefabricated construction, which is a method that relies on manufacturing structural and architectural units or elements in dedicated factories or manufacturing sites, and then assembling them on the project site according to a specific design and specifications, instead of carrying out all the work in a traditional way on site.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> With the growing need to accelerate project implementation, raise the efficiency of the contracting sector, and improve the quality of construction, modular construction has become one of the solutions that attracts the attention of developers, contractors, and those concerned with developing the construction sector, especially in projects whose units can be repeated or whose components can be standardized.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>What is the difference between prefabricated construction and modular construction?<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The term prefabricated construction is used to describe the manufacturing of parts of a building or its components outside the construction site, then transporting them to the site and installing them. Modular construction, on the other hand, often relies on dividing the building into units or standard parts designed according to specific dimensions and specifications, which can be manufactured and assembled repeatedly.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Modular construction does not necessarily mean that the entire building comes ready-made from the factory, as the degree of manufacturing varies according to the system used, and may include wall and ceiling panels, bathroom and kitchen units, complete residential units, or structural frames and parts that are installed on site.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Modern construction techniques also include precast concrete systems, lightweight metal structures, insulating formwork, and other solutions that fall under modern construction methods, although not all of them are standard construction in the strict sense.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>How does the modular construction process work?<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The process begins with designing the building in accordance with the manufacturing system used, so that dimensions, materials, and structural, electrical and mechanical connections are determined early, before moving to the production stage. This differs from traditional construction, which may allow for successive modifications during on-site implementation.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> After the design is approved, the units or elements are manufactured inside the factory, where a number of works can be carried out in parallel, such as preparing the structure, installing the insulation, carrying out some finishing work, and preparing the connections, depending on the nature of the unit and the level of manufacturing.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> At the same time, site preparation and foundation work can be carried out, allowing work phases to overlap instead of waiting for one phase to be completed and then starting the next, which is one of the reasons why modular construction is a candidate for reducing the execution time in suitable projects.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Upon completion of manufacturing, the components are transported to the site, lifted or installed according to an engineering plan, and then the connection works between the units, connections, final finishes, and necessary checks are carried out before delivery.<strong><\/strong><\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Is modular construction faster than traditional construction?<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The most significant advantage of modular construction lies in the ability to carry out several phases of the project in parallel. While the foundations are being prepared on-site, units or elements can be manufactured in the factory, which may reduce the overall time compared to projects that rely on carrying out all work on-site sequentially.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Standardizing units and repeating designs can also reduce the time required for repetitive work, especially in residential projects involving a large number of similar units, hotels, labor camps, or facilities that rely on repetitive models.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> However, the actual implementation time depends on several factors, including design readiness, factory availability, supply chain, distance between the factory and the site, foundation work, transportation and lifting operations, and the complexity of the project. Therefore, a specific percentage for saving time cannot be generalized to all projects without studying the case itself.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>What are the main advantages of modular and prefabricated construction?<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The advantages of modular construction go beyond speed, as manufacturing within a factory environment is linked to the ability to control production processes and monitor the quality of materials and work more regularly, while reducing the impact of weather or site conditions on certain stages of implementation.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Another potential advantage is reduced material waste, as cutting, assembly and storage processes can be organized more efficiently within the factory, compared to some traditional execution work that may result in excess materials or damage due to storage, transportation or site conditions.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> This approach may also contribute to improved labor management by transferring part of the work to an organized production environment, reducing reliance on on-site labor intensity in some stages of implementation, as well as the possibility of standardizing the quality of units when manufacturing is repeated.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Modular construction also provides opportunities for developing projects with repetitive designs, such as residential complexes, hotels, administrative buildings, and some educational and health facilities, provided that the nature of the project is compatible with the system used.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Is prefabricated construction less expensive?<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Determining the cost depends on the size of the project, the degree of frequency of units, the type of materials, the level of finishing, transportation and lifting costs, the nature of the factory, the availability of suppliers, in addition to the cost of design and initial equipment.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Standard construction may require early investments in precise engineering design, fabrication lines, molds, and production equipment, and transportation and lifting costs may be higher for large-scale units, especially if the factory is far from the project site.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> However, in large or recurring projects, some manufacturing and processing costs can be spread over a larger number of units, which may improve economic feasibility and reduce implementation costs resulting from delays, waste, or rework, if well planned.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Comparing traditional and prefabricated construction requires calculating the total cost of the project, not just the price of the structure or unit, including design, manufacturing, transportation, installation, foundations, connections, finishes, testing, and delivery.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Does standard construction comply with the Saudi Building Code?<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Yes, the use of modern construction technologies or prefabricated units does not mean exemption from the safety, quality, engineering and regulatory requirements in force in Saudi Arabia.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Compliance with the Saudi Building Code and the technical requirements related to structural safety, fire, thermal insulation, ventilation, electricity, drainage, and other building requirements remains an essential part of the design and implementation process.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> <strong><a href=\"https:\/\/www.sbc.gov.sa\/en\/Pages\/default.aspx?utm\"><mark class=\"has-inline-color has-accent-color\">The official website of the Saudi Building Code<\/mark><\/a><\/strong> explains that the code includes a set of requirements, specifications and regulations related to building and construction, with the aim of ensuring public safety and health, and includes a set of specialized codes that cover different aspects of buildings and facilities.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Therefore, the project owner or developer should ensure that the building system used, the manufactured components, the engineering design, and the installation work are all compliant with the code requirements and approved specifications, and that the implementation is carried out by qualified authorities and specialists.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>What should a property owner know before choosing a standard building?<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Before deciding to build a house or project using prefabricated building techniques, the owner should compare the available systems according to the nature of the project and its needs, and not be satisfied with promises related to speed of execution or low cost.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> This begins with verifying the experience of the manufacturer and contractor, reviewing previous projects they have implemented, and ensuring the quality of materials, the specifications of the construction system, and its suitability to the site and climatic environment.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The contract details should also be reviewed, so that they include technical specifications, the scope of work covered by manufacturing and installation, foundation work, transportation and lifting, connections, finishing, warranties, delivery dates, and the mechanism for dealing with changes or delays.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> It is also important to ensure that the design allows for future modifications, or that the owner understands the limits of flexibility in the system used, as modular construction may require early design decisions and make some changes after manufacturing has begun more expensive or difficult compared to traditional construction.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Will modular construction change the future of contracting?<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Modular and prefabricated construction represents a shift in the way construction operations are managed, from relying on the site as the center for all stages of implementation, to distributing work between design, manufacturing, transportation and installation, a shift that may enhance productivity, reduce waste and provide opportunities for quality standardization.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> But the success of this transformation is not linked to technology alone, but rather to the ability of the contracting sector to develop business models, integrate design with manufacturing, provide supply chains, qualify the workforce, develop control and quality systems, in addition to the market&#039;s acceptance of these solutions.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> In the Saudi market, modular construction opportunities may expand in projects that require speed of execution and repeatability of units, while traditional construction or hybrid systems remain more suitable for some projects that require special designs or great flexibility in implementation.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Therefore, modular construction does not appear to be a comprehensive alternative to all contracting methods, but rather represents one of the options that can reshape the sector, and give developers, contractors and owners new tools to improve project efficiency, when the appropriate system is chosen and the implementation phases are managed according to its requirements.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Standardized construction in Saudi Arabia: A move towards modern building technologies<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> In Saudi Arabia, there is increasing interest in modern construction technologies as part of efforts to develop the construction sector, enhance productivity, improve implementation efficiency, and support construction solutions that are appropriate for the size of residential and urban projects.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> In this context, the Ministry of Municipalities and Housing signed a memorandum of understanding with Samsung Construction Saudi Arabia during the Cityscape exhibition in Riyadh last year, to study cooperation in modern building technologies, including studying the possibility of establishing a specialized factory in the Kingdom, and focusing on transferring and localizing lightweight metal structure technology.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The ministry explained in <strong><a href=\"https:\/\/momah.gov.sa\/en\/node\/15694?utm\"><mark class=\"has-inline-color has-accent-color\">its official announcement regarding the memorandum of cooperation<\/mark><\/a><\/strong> that the agreement aims to enhance cooperation in advanced building technologies, and to study the demand for modular and prefabricated building technologies, as solutions that can contribute to raising the quality of construction, accelerating implementation and developing the construction sector.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> These steps are part of a broader trend towards localizing construction technologies, developing industrial capabilities related to the contracting sector, and enhancing cooperation between global companies, developers, contractors, and government agencies.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> <strong>Read also:<\/strong><\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> <strong><a href=\"https:\/\/amlak.net.sa\/en\/113172\/\" data-type=\"link\" data-id=\"https:\/\/amlak.net.sa\/113172\/\">Construction and demolition waste management: Solutions to reduce real estate project costs<\/a><\/strong><\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> <strong><a href=\"https:\/\/amlak.net.sa\/en\/113046\/\" data-type=\"link\" data-id=\"https:\/\/amlak.net.sa\/113046\/\">Accredited laboratories: The first line of defense for ensuring the quality of building products and protecting real estate.<\/a><\/strong><\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"><\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading time: <\/span> <span class=\"rt-time\"> 5<\/span> <span class=\"rt-label rt-postfix\">Minutes<\/span><\/span>Learn about modular and prefabricated construction, its advantages in speed of execution and waste reduction, its costs and requirements, and opportunities for its spread in the Saudi contracting sector.<\/p>","protected":false},"author":84,"featured_media":113227,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"\u0627\u0644\u0628\u0646\u0627\u0621 \u062e\u0627\u0631\u062c \u0627\u0644\u0645\u0648\u0642\u0639.. \u0647\u0644 \u062a\u0646\u0642\u0644 \u0627\u0644\u0645\u0635\u0627\u0646\u0639 \u0645\u0633\u062a\u0642\u0628\u0644 \u0627\u0644\u0645\u0642\u0627\u0648\u0644\u0627\u062a \u0625\u0644\u0649 \u0645\u0631\u062d\u0644\u0629 \u062c\u062f\u064a\u062f\u0629\u061f","_seopress_titles_desc":"\u062a\u0639\u0631\u0641 \u0639\u0644\u0649 \u0627\u0644\u0628\u0646\u0627\u0621 \u0627\u0644\u0645\u0639\u064a\u0627\u0631\u064a \u0648\u0645\u0633\u0628\u0642 \u0627\u0644\u0635\u0646\u0639\u060c \u0648\u0645\u0632\u0627\u064a\u0627\u0647 \u0641\u064a \u0633\u0631\u0639\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0648\u062a\u0642\u0644\u064a\u0644 \u0627\u0644\u0647\u062f\u0631\u060c \u0648\u062a\u0643\u0627\u0644\u064a\u0641\u0647 \u0648\u0627\u0634\u062a\u0631\u0627\u0637\u0627\u062a\u0647\u060c \u0648\u0641\u0631\u0635 \u0627\u0646\u062a\u0634\u0627\u0631\u0647 \u0641\u064a \u0642\u0637\u0627\u0639 \u0627\u0644\u0645\u0642\u0627\u0648\u0644\u0627\u062a \u0627\u0644\u0633\u0639\u0648\u062f\u064a.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"amlak_video_sent":"","footnotes":""},"categories":[123],"tags":[11184,11182,11183,10396,10320],"class_list":["post-113223","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-building-materials-techniques","tag-11184","tag-11182","tag-11183","tag-10396","tag-10320"],"acf":{"amlak_post_excerpt":"\u062a\u0639\u0631\u0641 \u0639\u0644\u0649 \u0627\u0644\u0628\u0646\u0627\u0621 \u0627\u0644\u0645\u0639\u064a\u0627\u0631\u064a \u0648\u0645\u0633\u0628\u0642 \u0627\u0644\u0635\u0646\u0639\u060c \u0648\u0645\u0632\u0627\u064a\u0627\u0647 \u0641\u064a \u0633\u0631\u0639\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0648\u062a\u0642\u0644\u064a\u0644 \u0627\u0644\u0647\u062f\u0631\u060c \u0648\u062a\u0643\u0627\u0644\u064a\u0641\u0647 \u0648\u0627\u0634\u062a\u0631\u0627\u0637\u0627\u062a\u0647\u060c \u0648\u0641\u0631\u0635 \u0627\u0646\u062a\u0634\u0627\u0631\u0647 \u0641\u064a \u0642\u0637\u0627\u0639 \u0627\u0644\u0645\u0642\u0627\u0648\u0644\u0627\u062a \u0627\u0644\u0633\u0639\u0648\u062f\u064a.","amlak_post_excerpt_source":{"label":"Amlak post excerpt","type":"text","formatted_value":"\u062a\u0639\u0631\u0641 \u0639\u0644\u0649 \u0627\u0644\u0628\u0646\u0627\u0621 \u0627\u0644\u0645\u0639\u064a\u0627\u0631\u064a \u0648\u0645\u0633\u0628\u0642 \u0627\u0644\u0635\u0646\u0639\u060c \u0648\u0645\u0632\u0627\u064a\u0627\u0647 \u0641\u064a \u0633\u0631\u0639\u0629 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0648\u062a\u0642\u0644\u064a\u0644 \u0627\u0644\u0647\u062f\u0631\u060c \u0648\u062a\u0643\u0627\u0644\u064a\u0641\u0647 \u0648\u0627\u0634\u062a\u0631\u0627\u0637\u0627\u062a\u0647\u060c \u0648\u0641\u0631\u0635 \u0627\u0646\u062a\u0634\u0627\u0631\u0647 \u0641\u064a \u0642\u0637\u0627\u0639 \u0627\u0644\u0645\u0642\u0627\u0648\u0644\u0627\u062a \u0627\u0644\u0633\u0639\u0648\u062f\u064a."}},"featured_image_urls":{"full":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_workers_web_enhanced.jpg",1330,700,false],"thumbnail":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_workers_web_enhanced-150x150.jpg",150,150,true],"medium":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_workers_web_enhanced-300x158.jpg",300,158,true],"medium_large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_workers_web_enhanced-768x404.jpg",768,404,true],"large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_workers_web_enhanced-1024x539.jpg",1024,539,true],"1536x1536":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_workers_web_enhanced.jpg",1330,700,false],"2048x2048":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_workers_web_enhanced.jpg",1330,700,false],"trp-custom-language-flag":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_workers_web_enhanced-18x9.jpg",18,9,true],"event-thumbnail":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_workers_web_enhanced-300x200.jpg",300,200,true],"event-medium":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_workers_web_enhanced-600x400.jpg",600,400,true],"event-large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_workers_web_enhanced-1200x700.jpg",1200,700,true],"event-hero":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/construction_workers_web_enhanced.jpg",1330,700,false]},"author_info":{"info":["\u0635\u062d\u064a\u0641\u0629 \u0623\u0645\u0644\u0627\u0643"]},"category_info":"<a href=\"https:\/\/amlak.net.sa\/en\/category\/development-construction\/building-materials-techniques\/\" rel=\"category tag\">\u0645\u0648\u0627\u062f \u0648\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621<\/a>","tag_info":"\u0645\u0648\u0627\u062f \u0648\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621","comment_count":"0","_links":{"self":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/113223","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/comments?post=113223"}],"version-history":[{"count":1,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/113223\/revisions"}],"predecessor-version":[{"id":113228,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/113223\/revisions\/113228"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media\/113227"}],"wp:attachment":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media?parent=113223"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/categories?post=113223"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/tags?post=113223"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}