{"id":113444,"date":"2026-11-28T11:02:12","date_gmt":"2026-11-28T08:02:12","guid":{"rendered":"https:\/\/amlak.net.sa\/?p=113444"},"modified":"2026-11-28T11:02:14","modified_gmt":"2026-11-28T08:02:14","slug":"%d9%85%d8%b9%d8%a7%d9%8a%d9%8a%d8%b1-%d8%ac%d8%af%d9%8a%d8%af%d8%a9-%d9%84%d8%aa%d8%b1%d8%a7%d8%ae%d9%8a%d8%b5-%d8%a7%d9%84%d9%85%d9%83%d8%a7%d8%aa%d8%a8-%d8%a7%d9%84%d9%87%d9%86%d8%af%d8%b3%d9%8a","status":"publish","type":"post","link":"https:\/\/amlak.net.sa\/en\/113444\/","title":{"rendered":"New standards for engineering office licenses: mandatory technical evaluation and restrictions on design approval."},"content":{"rendered":"<div class=\"translation-block\">\n<p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\">The system of engineering offices and companies in Saudi Arabia is preparing for a more organized phase, with the establishment of new standards for practicing engineering professions and conditions for obtaining and renewing licenses, including linking the continuation of the license to the level of technical readiness, and determining the powers of engineers according to their professional accreditation levels, in addition to tightening control over the quality of engineering works, designs and plans.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The new standards, prepared by <strong><a href=\"https:\/\/www.saudieng.sa\/Arabic\/Pages\/default.aspx\">the Saudi Council of Engineers<\/a><\/strong> , establish an integrated framework for the work of engineering establishments, including requirements for establishment, operation, contracting with clients, and the responsibilities of engineers and license holders, as well as regulating the use of cooperating staff and subcontractors, thereby enhancing the reliability of engineering services and raising the level of professional commitment in the sector.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>An &quot;evaluative&quot; assessment is a requirement for renewing engineering office licenses.<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> One of the most prominent changes included in the standards is linking the renewal of licenses <strong><a href=\"https:\/\/amlak.net.sa\/en\/?s=%D8%A7%D9%84%D9%87%D9%86%D8%AF%D8%B3%D9%8A%D8%A9\">for engineering offices and companies<\/a><\/strong> or the modification of their activities to the completion of the technical evaluation requirements according to the technical readiness standards \u201cQayyim\u201d, and obtaining the minimum level determined by the Authority according to the fields and specializations that the establishment is licensed to practice.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Issuing the license is not limited to fulfilling administrative procedures, but requires that the office owner or professional partner has a valid professional accreditation that is appropriate to the required activities, with the provision of an actual headquarters that meets the spatial requirements and an approved national address, and securing the necessary engineering and technical staff and documenting them with the Authority.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The standards also require the company to be registered in the commercial register, and for the manager of the office or company to have an academic qualification in engineering, with the exception of establishments licensed within the category of supporting engineering services, in addition to adhering to decisions and ratios for localizing engineering personnel.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Adding any new engineering activity to the license requires providing an engineer with a professional degree of no less than \u201cProfessional Engineer\u201d, while the practitioner must obtain the professional degree appropriate to his experience within one year of completing the required period according to the Professional Accreditation Guide.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>7 categories of licenses for engineering offices and companies<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The standards redefined the activities that engineering establishments can obtain licenses to practice, through seven categories including engineering consulting offices and companies, specialized engineering establishments, engineering support services companies, temporary contracting companies, foreign engineering companies, integrated contracting (EPC) companies, and engineering inspection companies.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Different professional requirements were set for each category; the owner of an engineering consultancy office or professional partner must have at least a \u201cprofessional engineer\u201d degree, while an \u201cassociate engineer\u201d degree is sufficient to establish a specialized engineering office or company.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> As for engineering support services establishments, it is required that its owner or professional partner has practical experience of no less than two years if he is in the category of technicians, while the establishment of integrated contracting companies requires experience of no less than five years in implementation and contracting, and that its activity includes preparing detailed engineering designs for the projects that it undertakes to implement and manage.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> As for engineering inspection companies, the standards stipulate that their main activity must be inspection, quality control and preparation of technical reports, with the presence of a professional engineer who has obtained a certificate of accreditation in the field of engineering inspection, and fulfillment of the required accreditation certificates from the competent authorities.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Approval of plans is restricted to the professional engineer and consultant.<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> In a move aimed at controlling responsibility for engineering outputs, the standards defined the powers of engineers according to their professional grades, so that the authority to approve documents, plans, reports and engineering works and seal them with the engineering seal is limited to those who hold the grades of \u201cProfessional Engineer\u201d and \u201cConsulting Engineer\u201d.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> As for the associate engineer, his powers are limited to preparing and reviewing the work under the supervision of the authorized persons, while the role of the engineer who has obtained the basic professional degree is focused on providing technical assistance to the work team.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The standards require engineers to sign the documents, plans, and reports that they prepare, review, or approve, and to provide their names, professional accreditation numbers, and grades on the work. The license holder or manager must sign all outputs issued by the facility and stamp them with its official seal, and verify that the required engineering signatures and seals are complete.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> It also prohibited the adoption or delivery of engineering designs and documents of unknown origin or issued by uncertified persons or unlicensed establishments, and obliged offices to provide proof of the source of the work when requested by the Authority.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>10 years to retain engineering plans and contracts<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The standards set documentation obligations for engineering offices and companies, including keeping original documents, contracts, plans and engineering works for 10 years from the date of termination of the contractual relationship, while allowing the storage of certified electronic copies.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Establishments must also maintain a record documenting the stages of work preparation and review, the names of those involved, and the nature of their contractual relationship with the establishment, in order to track technical responsibilities when any errors or disputes arise.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> With regard to dealing with clients, the standards prohibit the commencement of any engineering work without a written contract that specifies the scope of service, its duration, delivery dates, and the obligations of the parties, in addition to fees, payment mechanisms, quality guarantees, and methods of dispute resolution, while clarifying the assumptions and exceptions that affect the results, and regulating intellectual property rights for designs, plans, and reports resulting from the contract.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> It also prohibits the inclusion of conditions that exempt the engineer or license holder from professional liability arising from negligence or breach of his obligations.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Regulations for hiring engineers and subcontractors<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The standards allowed engineering offices and companies to employ professionally accredited Saudi engineers working on a cooperative basis without requiring full-time commitment, provided that there are written contracts that specify the scope and duration of the work, and adherence to the specialization and professional grade of each engineer.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> It also allowed the use of licensed engineering offices and companies to provide services that the establishment does not practice itself, in accordance with the procedures regulating this.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> In contrast, conditions were set for using subcontractors, including ensuring that the party obtains the necessary licenses and technical qualifications, informing the client in advance in writing of the nature of the subcontracting and the scope of the other party\u2019s contribution and obtaining its approval, in addition to documenting the relationship with a contract that specifies the rights and obligations, conditions of confidentiality, data protection and intellectual property.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The standards require the original office to review and technically verify the quality of the work submitted by the subcontractor before approving or delivering it to the client, with reference to the party involved in the work that contributed to its preparation.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Prohibition of license leasing and conflict of interest<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The standards emphasized the prohibition of leasing engineering licenses or allowing others to exploit them. They also prohibited the use of engineers\u2019 names or data without their consent, or assigning the preparation, review, and approval of work to people whose professional qualifications do not permit it.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The prohibitions extended to practices related to professional cover-ups, including enabling uncertified individuals to practice the profession under the names of other engineers, or using signatures and seals to certify work that its owners did not actually participate in preparing, reviewing, or supervising.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> It also prohibits operating an engineering facility without an actual headquarters, maintaining a nominal membership in a facility, or delivering work prepared outside of it in violation of the specified regulations.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> On the professional integrity side, the standards prohibited bribery, illicit commissions, falsification of documents and engineering reports, abuse of job influence, as well as making misleading offers or attracting clients and employees by illicit means.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> It also placed restrictions on conflicts of interest, prohibiting the combination of tasks requiring independent professional opinion with conflicting personal or financial interests, or providing services to conflicting parties in the same project without prior written disclosure and the consent of all parties.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>New guidelines for engineers&#039; appearances on social media platforms<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The standards extended to the media activity of engineers and license holders on social media platforms, as they prohibited the publication of misleading or inaccurate technical information or opinions about projects, facilities, products and services, or promoting and republishing them in a way that suggests their adoption without relying on documented scientific and professional foundations.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> It also mandated the disclosure of business relationships when promoting products and services through paid advertising, and prohibited defamation of engineering firms and projects or directing criticisms that are not based on facts and technical foundations.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> An engineer may not express a technical opinion on a project in which he participated or disclose information pertaining to it without written permission, and he is also prohibited from giving opinions on matters outside his area of specialization.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Professional responsibility extends to errors and damages<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> With regard to accountability, the standards hold the licensee professionally responsible for all works, designs, and reports issued in his name, even if he uses other parties to prepare them, and he may not evade this responsibility on the grounds that he assigned the work to another party.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The engineer is also responsible for the work he prepared, reviewed, approved, or supervised, throughout the duration of the contract and until the end of the legally prescribed liability period.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> Accountability cases include negligence, dereliction of duty, gross technical errors, violation of regulations, the engineer&#039;s code of conduct, and damages to clients or other parties resulting from professional error.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> If a material error is discovered in an engineering work issued by him, the engineer and the license holder must notify the concerned parties not to rely on the work, and work to correct it and document the actions taken.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The standards also authorized the Saudi Council of Engineers to identify categories of engineers and establishments that are obligated to insure against professional liability arising from errors and omissions.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>Regular and surprise inspections of offices and projects<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The standards granted the Saudi Council of Engineers the authority to monitor the implementation of the requirements, including conducting periodic and surprise inspections of license holders and projects, and receiving reports related to violations while maintaining the confidentiality of the identity of the informants and the information they provide.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> It also authorized the Authority to temporarily suspend services provided to an engineering office or company if it is proven that there are practices that affect the safety of the profession or the quality of services or violate the system and standards, provided that the suspension continues until its causes are addressed in accordance with the approved procedures.<\/p><h2 class=\"wp-block-heading\" style=\"text-align:left;direction:ltr\"> <strong>The license period is from two to three years.<\/strong><\/h2><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The standards set the duration of licenses for engineering offices and companies at no less than 24 months and no more than 36 months, with the exception of temporary contract companies whose license is issued for the entire duration of the contract, and obliging establishments wishing to renew to apply before the license expires at least 60 days before it expires.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> It also allowed the opening of new branches after approval by the Authority, provided that a qualified Saudi engineer with a professional rank of no less than \u201cAssociate Engineer\u201d is provided to manage the branch and follow up on its work.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> License holders are required to update their data with the Authority, including the national address and municipal license, within 30 days of any change occurring, while the heirs are permitted, within 12 months of the death of the office owner or professional partner, to transfer the office or his share in the company to a person who meets the same professional and regulatory requirements.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> The final provisions stipulate that the standards shall come into effect from the date of their approval, replacing the previous standards issued in 1440 AH and their amendments, with the Authority setting a deadline for existing license holders to adjust their situations in accordance with the new requirements.<\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> <strong>To view the standards for practicing engineering professions and the licensing requirements for engineering offices and companies, click <a href=\"https:\/\/istitlaa.scbc.gov.sa\/ar\/trade\/sce\/scestandars\/Documents\/%D9%85%D8%B9%D8%A7%D9%8A%D9%8A%D8%B1%20%D9%85%D8%B2%D8%A7%D9%88%D9%84%D8%A9%20%D8%A7%D9%84%D9%85%D9%87%D9%86%20%D8%A7%D9%84%D9%87%D9%86%D8%AF%D8%B3%D9%8A%D8%A9%20%D9%88%D8%B4%D8%B1%D9%88%D8%B7%20%D8%A7%D9%84%D8%AA%D8%B1%D8%A7%D8%AE%D9%8A%D8%B5%20%D9%84%D9%84%D9%85%D9%83%D8%A7%D8%AA%D8%A8%20%D9%88%D8%A7%D9%84%D8%B4%D8%B1%D9%83%D8%A7%D8%AA%20%D8%A7%D9%84%D9%87%D9%86%D8%AF%D8%B3%D9%8A%D8%A9.pdf\">here<\/a> .<\/strong><\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> <strong>Read also:<\/strong><\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> <strong>The Saudi Council of Engineers issues regulations for the work of the Committee of Engineering Offices and Companies.<\/strong><br><strong><br><\/strong> <a href=\"https:\/\/amlak.net.sa\/en\/110842\/\"><strong>The Saudi Council of Engineers launches a program to develop the capabilities of engineering offices.<\/strong><\/a><\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> <a href=\"https:\/\/amlak.net.sa\/en\/111764\/\"><strong>Engineering offices in Riyadh are required to contract with an approved waste transporter in order to obtain a building permit.<\/strong><\/a><\/p><p class=\"wp-block-paragraph\" style=\"text-align:left;direction:ltr\"> <a href=\"https:\/\/amlak.net.sa\/en\/112578\/\"><strong>&quot;Municipalities and Housing&quot;: Increasing the localization rate of engineering technical professions supports the development of competencies<\/strong><\/a><\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading time: <\/span> <span class=\"rt-time\"> 6<\/span> <span class=\"rt-label rt-postfix\">Minutes<\/span><\/span>The new standards link licensing and renewal to technical readiness, and limit the approval of designs and plans to specific professional grades.<\/p>","protected":false},"author":27,"featured_media":113473,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"\u0645\u0639\u0627\u064a\u064a\u0631 \u062c\u062f\u064a\u062f\u0629 \u0644\u062a\u0631\u0627\u062e\u064a\u0635 \u0627\u0644\u0645\u0643\u0627\u062a\u0628 \u0627\u0644\u0647\u0646\u062f\u0633\u064a\u0629.. \u062a\u0642\u064a\u064a\u0645 \u0641\u0646\u064a \u0625\u0644\u0632\u0627\u0645\u064a \u0648\u0642\u064a\u0648\u062f \u0639\u0644\u0649 \u0627\u0639\u062a\u0645\u0627\u062f \u0627\u0644\u062a\u0635\u0627\u0645\u064a\u0645","_seopress_titles_desc":"\u0627\u0644\u0645\u0639\u0627\u064a\u064a\u0631 \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u062a\u0631\u0628\u0637 \u0627\u0644\u062a\u0631\u062e\u064a\u0635 \u0648\u0627\u0644\u062a\u062c\u062f\u064a\u062f \u0628\u0627\u0644\u062c\u0627\u0647\u0632\u064a\u0629 \u0627\u0644\u0641\u0646\u064a\u0629\u060c \u0648\u062a\u0642\u0635\u0631 \u0627\u0639\u062a\u0645\u0627\u062f \u0627\u0644\u062a\u0635\u0627\u0645\u064a\u0645 \u0648\u0627\u0644\u0645\u062e\u0637\u0637\u0627\u062a \u0639\u0644\u0649 \u062f\u0631\u062c\u0627\u062a \u0645\u0647\u0646\u064a\u0629 \u0645\u062d\u062f\u062f\u0629.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"amlak_video_sent":"","footnotes":""},"categories":[104],"tags":[10374,11266,11265,11264],"class_list":["post-113444","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-legislation-and-regulations","tag-10374","tag-11266","tag-11265","tag-11264"],"acf":{"amlak_post_excerpt":"\u0627\u0644\u0645\u0639\u0627\u064a\u064a\u0631 \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u062a\u0631\u0628\u0637 \u0627\u0644\u062a\u0631\u062e\u064a\u0635 \u0648\u0627\u0644\u062a\u062c\u062f\u064a\u062f \u0628\u0627\u0644\u062c\u0627\u0647\u0632\u064a\u0629 \u0627\u0644\u0641\u0646\u064a\u0629\u060c \u0648\u062a\u0642\u0635\u0631 \u0627\u0639\u062a\u0645\u0627\u062f \u0627\u0644\u062a\u0635\u0627\u0645\u064a\u0645 \u0648\u0627\u0644\u0645\u062e\u0637\u0637\u0627\u062a \u0639\u0644\u0649 \u062f\u0631\u062c\u0627\u062a \u0645\u0647\u0646\u064a\u0629 \u0645\u062d\u062f\u062f\u0629.","amlak_post_excerpt_source":{"label":"Amlak post excerpt","type":"text","formatted_value":"\u0627\u0644\u0645\u0639\u0627\u064a\u064a\u0631 \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u062a\u0631\u0628\u0637 \u0627\u0644\u062a\u0631\u062e\u064a\u0635 \u0648\u0627\u0644\u062a\u062c\u062f\u064a\u062f \u0628\u0627\u0644\u062c\u0627\u0647\u0632\u064a\u0629 \u0627\u0644\u0641\u0646\u064a\u0629\u060c \u0648\u062a\u0642\u0635\u0631 \u0627\u0639\u062a\u0645\u0627\u062f \u0627\u0644\u062a\u0635\u0627\u0645\u064a\u0645 \u0648\u0627\u0644\u0645\u062e\u0637\u0637\u0627\u062a \u0639\u0644\u0649 \u062f\u0631\u062c\u0627\u062a \u0645\u0647\u0646\u064a\u0629 \u0645\u062d\u062f\u062f\u0629."}},"featured_image_urls":{"full":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/sce_enhanced_1920x1080.jpg",1920,1080,false],"thumbnail":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/sce_enhanced_1920x1080-150x150.jpg",150,150,true],"medium":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/sce_enhanced_1920x1080-300x169.jpg",300,169,true],"medium_large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/sce_enhanced_1920x1080-768x432.jpg",768,432,true],"large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/sce_enhanced_1920x1080-1024x576.jpg",1024,576,true],"1536x1536":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/sce_enhanced_1920x1080-1536x864.jpg",1536,864,true],"2048x2048":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/sce_enhanced_1920x1080.jpg",1920,1080,false],"trp-custom-language-flag":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/sce_enhanced_1920x1080-18x10.jpg",18,10,true],"event-thumbnail":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/sce_enhanced_1920x1080-300x200.jpg",300,200,true],"event-medium":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/sce_enhanced_1920x1080-600x400.jpg",600,400,true],"event-large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/sce_enhanced_1920x1080-1200x800.jpg",1200,800,true],"event-hero":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2026\/11\/sce_enhanced_1920x1080.jpg",1920,1080,false]},"author_info":{"info":["\u0623\u0645\u0644\u0627\u0643 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u0629"]},"category_info":"<a href=\"https:\/\/amlak.net.sa\/en\/category\/development-construction\/legislation-and-regulations\/\" rel=\"category tag\">\u0627\u0644\u062a\u0634\u0631\u064a\u0639\u0627\u062a \u0648\u0627\u0644\u0623\u0646\u0638\u0645\u0629<\/a>","tag_info":"\u0627\u0644\u062a\u0634\u0631\u064a\u0639\u0627\u062a \u0648\u0627\u0644\u0623\u0646\u0638\u0645\u0629","comment_count":"0","_links":{"self":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/113444","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/comments?post=113444"}],"version-history":[{"count":2,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/113444\/revisions"}],"predecessor-version":[{"id":113475,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/113444\/revisions\/113475"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media\/113473"}],"wp:attachment":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media?parent=113444"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/categories?post=113444"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/tags?post=113444"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}