{"id":1559,"date":"2013-11-16T14:00:00","date_gmt":"2013-11-16T14:00:00","guid":{"rendered":"http:\/\/amlak.net.sa?p=1559"},"modified":"2013-11-16T14:00:00","modified_gmt":"2013-11-16T14:00:00","slug":"%d8%a7%d9%82%d8%aa%d8%b1%d8%a7%d8%a8-%d8%a7%d9%84%d8%a7%d9%86%d8%aa%d9%87%d8%a7%d8%a1-%d9%85%d9%86-%d8%a7%d9%84%d9%85%d8%b1%d8%ad%d9%84%d8%a9-%d8%a7%d9%84%d8%a3%d9%88%d9%84%d9%89-%d9%85%d9%86-%d8%a7","status":"publish","type":"post","link":"https:\/\/amlak.net.sa\/en\/1559\/","title":{"rendered":"The first phase of affordable housing in Makkah is nearing completion"},"content":{"rendered":"<p>The first phase of affordable housing in Makkah is nearing completion<\/p>\n<p> Mecca\u2014Amlak<br \/>\n   Work is proceeding at a rapid pace to complete the first phase of the affordable housing project in Makkah, which consists of 23 residential buildings with a total of 500 housing units, in addition to a number of commercial buildings and facilities for business and public services, and includes a modern network of roads and streets, as well as water, electricity, and sewage systems.<br \/>\nThis comes after the committee overseeing affordable housing completed its outreach to property owners and residents, which had been conducted earlier to allow owners to inspect the housing units and view them on-site, with the aim of getting a close look at the final finishes and to provide their feedback so that it could be incorporated before the final finishing work and handover.<br \/>\nWork currently underway includes interior finishing of the residential units, including carpentry, wall painting, electrical work, tiling, and flooring, while exterior infrastructure work is proceeding at full speed, including road construction and the installation of electrical, water, and sewer systems. .<br \/>\n For his part, Engineer Mamdouh Al-Harbi, Executive Director of \u2018Wahat Makkah,\u2019 that strict criteria have been established for construction companies, based on the highest engineering standards that include all safety and public health requirements, ensuring the protection of lives and property from natural hazards.<br \/>\nHe added that the unit designs were selected based on environmental and economic factors that prioritize sustainability, ensure healthy building conditions, promote energy and water conservation, and improve the indoor environment. It is worth noting that the Makkah Oasis project comprises 2,400 residential units, divided into two geographic areas, including 1,700 affordable housing units, and 700 upscaled housing units ranging from villas and duplexes to apartments of various sizes and layouts, which are still available for sale, in addition to a number of commercial and service buildings and public facilities located throughout several developments.<br \/>\nThe Makkah Oasis project includes residential units ranging in size from 80 square meters to 120 square meters per unit; however, demand is highest for the larger units, so we have built the largest number of 120-square-meter units. He noted that smaller units are suitable for young people and families just starting out, because a young person looking to start a family initially needs housing that fits within their budget, and owning this \u201casset\u201d itself provides the opportunity to move to a larger home in the future as their income improves.<\/p>","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading time: <\/span> <span class=\"rt-time\"> 2<\/span> <span class=\"rt-label rt-postfix\">Minutes<\/span><\/span>First Phase of Affordable Housing Project in Makkah Nearing Completion Makkah-Amlak is accelerating its efforts to complete the first phase of the affordable housing project in Makkah, which consists of 23 residential buildings with a total of 500 housing units, in addition to a number of commercial buildings and others for public services, and includes a modern network of roads and streets \u2026 <a title=\"The first phase of affordable housing in Makkah is nearing completion\" class=\"read-more\" href=\"https:\/\/amlak.net.sa\/en\/1559\/\" aria-label=\"Read more about the imminent completion of the first phase of affordable housing in Makkah\">Read more<\/a><\/p>","protected":false},"author":34,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"0","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"footnotes":""},"categories":[7786],"tags":[],"class_list":["post-1559","post","type-post","status-publish","format-standard","hentry","category-mecca-madinah"],"acf":{"amlak_post_excerpt":"","amlak_post_excerpt_source":{"label":"Amlak post excerpt","type":"text","formatted_value":""}},"featured_image_urls":{"full":"","thumbnail":"","medium":"","medium_large":"","large":"","1536x1536":"","2048x2048":"","trp-custom-language-flag":"","event-thumbnail":"","event-medium":"","event-large":"","event-hero":""},"author_info":{"info":["\u0627\u0645\u0644\u0627\u0643 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u0629"]},"category_info":"<a href=\"https:\/\/amlak.net.sa\/en\/category\/regions\/mecca-madinah\/\" rel=\"category tag\">\u0645\u0646\u0637\u0642\u0629 \u0645\u0643\u0629 \u0648\u0627\u0644\u0645\u062f\u064a\u0646\u0629<\/a>","tag_info":"\u0645\u0646\u0637\u0642\u0629 \u0645\u0643\u0629 \u0648\u0627\u0644\u0645\u062f\u064a\u0646\u0629","comment_count":"0","_links":{"self":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/1559","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/users\/34"}],"replies":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/comments?post=1559"}],"version-history":[{"count":0,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/1559\/revisions"}],"wp:attachment":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media?parent=1559"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/categories?post=1559"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/tags?post=1559"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}