{"id":16935,"date":"2017-08-20T11:19:53","date_gmt":"2017-08-20T08:19:53","guid":{"rendered":"http:\/\/www.amlak.net.sa\/?p=16935"},"modified":"2017-08-20T11:19:53","modified_gmt":"2017-08-20T08:19:53","slug":"%d9%85%d8%b1%d8%a7%d8%ad%d9%84-%d8%a8%d9%86%d8%a7%d8%a1-%d8%a7%d9%84%d9%81%d9%84%d9%84-%d8%a7%d9%84%d8%b3%d9%83%d9%86%d9%8a%d8%a9","status":"publish","type":"post","link":"https:\/\/amlak.net.sa\/en\/16935\/","title":{"rendered":"Installing Windows and Doors EPISODE ( 58 ) Majed Almuhaimeed"},"content":{"rendered":"<div class=\"translation-block\"><p class=\"p1\" dir=\"rtl\">After completing the application of the \u00abcement mix\u00bb and spraying it with water for four days, the plastering contractor then proceeds with his work, starting from the highest point of the building \u00abjacket and roof appendages\u00bb where the \u00abbougies\u00bb are implemented, which are small pieces of cement or tiles placed on the corners of the wall and the tendons are tightened to ensure that the wall is straight, after that the actual plastering is started, first the roofs and then the walls.<\/p> <p class=\"p1\" dir=\"rtl\">If the block used in the project is red brick or aerated concrete products \u00abwhite block\u00bb, it is good to add chemicals to the plastering of the roofs, then the walls.\n<p class=\"p1\" dir=\"rtl\">If the block used in the project is red brick or aerated concrete products \"white block\" it is good to add some chemicals with the mortar mix, these substances contribute to the adhesion of the mortar to the walls and ceilings.<\/p> <p class=\"p1\" dir=\"rtl\">If the block used in the project is red brick or aerated concrete products \"white block\", it is good to add some chemicals with the mortar mix.\n<p class=\"\u00abp1\u00bb\" dir=\"rtl\">It is advisable to install galvanized iron corners for lime on all protruding corners of the walls, it reduces the force of impact or friction that usually leaves a mark on the lime or paint if these corners are not present.<\/p> <p class=\"p1\" dir=\"rtl\"> <\/p> <p class=\"p1\" dir=\"rtl\">\n<p class=\"p1\" dir=\"rtl\">Care must be taken to weigh and straighten window and door openings, this helps a lot by not having gaps when installing windows and doors, knowing that the ends of the wall are covered by the frame surrounding the door and window, and this does not reduce the importance of presenting the work well, and emphasizing The importance of following up the work of the contractor and receiving each stage that is carried out on a daily basis, and if there are any observations, they must be re-executed before the mixture dries and ensure that the cement mixture is not wasted and emphasize the cleaning of the floors before starting to use the fallout from the mixture again.<\/p>\n<p class=\"\u00abp1\u00bb\" dir=\"rtl\">If the mortar used in the ceilings is polystyrene cork, it is not recommended to make the lath for these ceilings, due to the lack of cohesion of the cement mortar with the cork, there are those who install a metal grid for the ceilings in order to hold the lath mortar to the ceiling, this procedure is not safe as the cement mortar is not lightweight, it may fall in the future and cracks will appear quickly.<\/p> <p class=\"p1\" dir=\"\u00abrtl\u00bb\">\n<p class=\"\u00abp1\u00bb\" dir=\"rtl\">The liasa is made for bathrooms and kitchens with roughing the liasa, to ensure that the glue for future tiles adheres well to the liasa, roughing is done for the areas where the tiles will be installed only.<\/p> <p class=\"p1\" dir=\"\u00abrtl\u00bb\">Roughing the liasa is done for the areas where the tiles will be installed.\n<p class=\"p1\" dir=\"rtl\">The importance of smoothing the inverted bridges of the surfaces of the roof annexes and the surfaces of the floor annexes must be emphasized, as it is a requirement for <a href=\"https:\/\/amlak.net.sa\/en\/home\/%d9%85%d9%82%d8%a7%d9%84%d8%a7%d8%aa-%d8%b5%d8%ad%d9%8a%d9%81%d8%a9-%d8%a3%d9%85%d9%84%d8%a7%d9%83-%d8%a7%d9%84%d8%b9%d9%82%d8%a7%d8%b1%d9%8a%d8%a9-%d8%a8%d9%8a%d8%aa-%d8%a7%d9%84%d8%b9%d9%85%d8%b1\/\">ideal hydro and thermal insulation works<\/a> that the inverted bridges of these surfaces are smooth and clean, and this is achieved when performing smoothing for them.<\/p> <p class=\"p1\" dir=\"rtl\">\n<p class=\"p1\" dir=\"rtl\">The liasa contractor continues his work on the project for all floors \"first, ground, basement if any\" until all liasa work is completed for the interior of the building, and emphasize the importance of spraying liasa with fresh water and avoiding salt water, as it negatively affects the quality of work and paints in the future, spraying for five days at twice a day.<\/p> <p class=\"p1\" dir=\"rtl\">The liasa contractor continues his work on the project for all floors \"first, ground, basement if any\" until all liasa work is completed.\n<p class=\"p1\" dir=\"rtl\"> Upon completion of the implementation of the liasa item for the interior of the building, one of the entities specialized in water and thermal insulation works is contracted to implement the \"insulation\" item for all surfaces exposed to external factors, namely \"the surfaces of the upper and ground annexes and the surface of the main building\"..<\/p> <p class=\"p1\" dir=\"rtl\">.\n<p class=\"p1\" dir=\"rtl\">In the next episode, we will deal with water and thermal insulation systems and some guidelines about it, noting that our reference in this series is the book \"Stages of Building Residential Villas\".<\/p> <p class=\"p1\" dir=\"rtl\">\n<\/div>","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading time: <\/span> <span class=\"rt-time\"> 2<\/span> <span class=\"rt-label rt-postfix\">Minutes<\/span><\/span>Once the \u00abnail-based mortar\u00bb plastering is complete and the surface has been sprayed with water for four days, the plasterer begins work starting from the highest point of the building \u00abroof deck and extensions,\u00bb where \u00abbuj\u00bb is applied\u2014small pieces of cement or tile placed at the corners of the wall\u2014and strings are stretched to ensure the wall is straight. After that\u2026 <a title=\"Installing Windows and Doors EPISODE ( 58 ) Majed Almuhaimeed\" class=\"read-more\" href=\"https:\/\/amlak.net.sa\/en\/16935\/\" aria-label=\"Read more about Installing Windows and Doors.. Episode (58) Majid Al-Muhimidi\">Read more<\/a><\/p>","protected":false},"author":10,"featured_media":3613,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"0","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"\u0627\u0644\u0639\u0632\u0644 \u0627\u0644\u0645\u0627\u0626\u064a","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"amlak_video_sent":"","footnotes":""},"categories":[123],"tags":[],"class_list":["post-16935","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-building-materials-techniques"],"acf":{"amlak_post_excerpt":"","amlak_post_excerpt_source":{"label":"Amlak post excerpt","type":"text","formatted_value":""}},"featured_image_urls":{"full":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"thumbnail":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"medium":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"medium_large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"1536x1536":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"2048x2048":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"trp-custom-language-flag":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",18,12,false],"event-thumbnail":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"event-medium":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"event-large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"event-hero":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false]},"author_info":{"info":["\u0627\u0645\u0644\u0627\u0643 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u0629"]},"category_info":"<a href=\"https:\/\/amlak.net.sa\/en\/category\/development-construction\/building-materials-techniques\/\" rel=\"category tag\">\u0645\u0648\u0627\u062f \u0648\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621<\/a>","tag_info":"\u0645\u0648\u0627\u062f \u0648\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621","comment_count":"0","_links":{"self":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/16935","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/comments?post=16935"}],"version-history":[{"count":0,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/16935\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media\/3613"}],"wp:attachment":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media?parent=16935"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/categories?post=16935"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/tags?post=16935"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}