{"id":19099,"date":"2018-01-14T14:22:24","date_gmt":"2018-01-14T11:22:24","guid":{"rendered":"http:\/\/www.amlak.net.sa\/?p=19099"},"modified":"2018-01-14T14:22:24","modified_gmt":"2018-01-14T11:22:24","slug":"%d9%85%d9%82%d8%a7%d9%84%d8%a7%d8%aa-%d8%b5%d8%ad%d9%8a%d9%81%d8%a9-%d8%a3%d9%85%d9%84%d8%a7%d9%83-%d8%a7%d9%84%d8%b9%d9%82%d8%a7%d8%b1%d9%8a%d8%a9-%d8%a8%d9%8a%d8%aa-%d8%a7%d9%84%d8%b9%d9%85%d8%b1","status":"publish","type":"post","link":"https:\/\/amlak.net.sa\/en\/19099\/","title":{"rendered":"Implementing Roof Waterproofing, Episode (64) Majid Almuhaimeed"},"content":{"rendered":"<p class=\"p1\" dir=\"rtl\">\u00a0<a href=\"https:\/\/amlak.net.sa\/en\/home\/%d8%aa%d9%86%d9%81%d9%8a%d8%b0-%d8%a7%d9%84%d8%b9%d8%b2%d9%84-%d8%a7%d9%84%d9%85%d8%a7%d8%a6%d9%8a\/\">Roof waterproofing<\/a> After its implementation, the necessary test is carried out to ensure that there are no observations or leaks in the insulation works, at the same time, the supply and installation of ducts for central air conditioning, hidden \u00abConcealed\u00bb and desert air conditioning, if any, provided that the implementation of the lining works has been completed At the same time, the supply and installation of ducts for central air conditioning, hidden \u00abConsolidated\u00bb and desert air conditioning, if any, should have been completed, provided that the work of lining the walls has been carried out, and the installation of ducts after the waterproofing test allows us to watch the leaks, if any, in the ceilings.<\/p>\n<p class=\"p1\" dir=\"rtl\">The plan for the air-conditioning is prepared by the air-conditioner in accordance with the design of the gypsum ceilings prepared by the interior designer \u00ab<a href=\"https:\/\/amlak.net.sa\/en\/home\/%d9%88%d9%83%d9%8a%d9%84-%d8%a7%d9%84%d9%82%d8%b1%d9%88%d9%8a%d8%a9-%d9%88%d8%a7%d9%84%d8%a8%d9%84%d8%af%d9%8a%d8%a9-%d9%8a%d9%81%d8%aa%d8%aa%d8%ad-%d9%85%d8%b9%d8%b1%d8%b6-%d8%a7%d9%84%d8%aa\/\">Decorator<\/a>\u00bbAnd emphasize the importance of reviewing the duct plan by the interior designer before proceeding with the implementation to match it with the gypsum plans and approve it.<\/p>\n<p class=\"p1\" dir=\"rtl\">Care must be taken to review the decoration plans for false ceilings \u00abgypsum and others\u00bb, provided that the plans include the locations of lighting openings, as there is no doubt that lighting plays an important role in the aesthetics of the space and the building in general, the lighting plan can be implemented in accordance with the design of false ceilings by the interior designer, or by those specialized in lighting.<\/p>\n<p class=\"p1\" dir=\"rtl\">The duct sheeting is supplied to the site and executed according to the plans, emphasizing the importance of good duct insulation and observing the specifications specified in the contract, which are usually in accordance with the American Society of Engineers standard specifications for duct work. <a href=\"https:\/\/amlak.net.sa\/en\/home\/%d8%aa%d8%b2%d8%a7%d9%85%d9%86%d8%a7%d9%8b-%d9%85%d8%b9-%d9%85%d8%b9%d8%b1%d8%b6-%d8%a7%d9%84%d8%aa%d9%83%d9%8a%d9%8a%d9%81-%d9%85%d8%b9%d8%b1%d8%b6-%d8%a7%d9%84%d9%83%d9%87%d8%b1%d8%a8%d8%a7%d8%a1\/\">Air Conditioning, Refrigeration and Ventilation<\/a> <span class=\"s1\">(ASHRAE)<\/span> as well as the American Duct Manufacturers Association specifications <span class=\"s1\">(SMACNA)<\/span> At the same time, the supply and installation of indoor air conditioning units for the hidden air conditioners \u00abConcealed\u00bb and also for the \u00abCast\u00bb air conditioner, and upon completion of all these works, care must be taken to review them according to the plans and if there is any discrepancy, it will be fixed during this stage.<\/p>\n<p class=\"p1\" dir=\"rtl\">After that, the implementation of the borrowed ceilings is started, usually gypsum is used, but we can also use gypsum board, ordinary gypsum is characterized by the possibility of molding it and implementing all designs in it, no matter how many decorative details and inscriptions, gypsum board can also implement multiple designs in it and is ideal if the ceilings have designs without many decorative details, curves and so on.<\/p>\n<p class=\"p1\" dir=\"rtl\">When there are borrowed ceilings exposed to external weather factors, it is recommended to use moisture-resistant gypsum board or cement board, as it has high resistance and this contributes to extending its lifespan without being affected, and care must be taken to contract with a specialized body specialized in carrying out gypsum work or a specialized contractor, with the need to make several quotes and choose the most appropriate one, specifying the method of installation and specifications, and writing a contract on official paper with the need to specify the prices of all works and the method of calculating the costs, both for ceilings and also for wall decorations, if any And the thickness of the gypsum tiles, and writing a contract on the official paper of the executing entity with the need to specify the prices of all works and the method of calculating the costs, whether for ceilings and also for wall decorations, if any, noting that wall decorations are implemented later when the floor tiles are completed to avoid the contact of gypsum or gypsum board with the mortar, and this contributes to the arrival of moisture and damage to the gypsum and peeling paint.<\/p>\n<p class=\"p1\" dir=\"rtl\">Ordinary gypsum is used in rooms, halls and others, and moisture-resistant gypsum, known as French gypsum, as well as moisture-resistant gypsum board panels are used in places exposed to moisture such as kitchens, restrooms and laundry rooms, and gypsum is installed and hung in two ways, the first: Using pistol shots, hair and metal wire, the second: using the metal mesh, which is the best and its higher costs and is recommended for large areas, as well as when the borrowed ceiling falls from the concrete ceiling for a distance of more than 25 cm when there are air ducts \u00abDuct\u00bb, also gypsum board and cement board are installed using the metal mesh.<\/p>","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading time: <\/span> <span class=\"rt-time\"> 2<\/span> <span class=\"rt-label rt-postfix\">Minutes<\/span><\/span>\u00a0The waterproofing works of the roofs after their implementation, the necessary test is carried out to ensure that there are no observations or leaks in the insulation works, at the same time, the supply and installation of ducts for central air conditioning, hidden \u00abConcealed\u00bb and desert air conditioning, if any, provided that the internal wall lining works have been completed, if the installation of ... <a title=\"Implementing Roof Waterproofing, Episode (64) Majid Almuhaimeed\" class=\"read-more\" href=\"https:\/\/amlak.net.sa\/en\/19099\/\" aria-label=\"Read more about \u062a\u0646\u0641\u064a\u0630 \u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u0639\u0632\u0644 \u0627\u0644\u0645\u0627\u0626\u064a \u0644\u0644\u0623\u0633\u0637\u062d ..\u0627\u0644\u062d\u0644\u0642\u0629 (\u0666\u0664) \u0645\u0627\u062c\u062f \u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f\">Read more<\/a><\/p>","protected":false},"author":10,"featured_media":3613,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"0","_seopress_titles_title":"","_seopress_titles_desc":"\u062f\u064a\u0643\u0648\u0631 \u0648\u063a\u0631\u0641 \u0646\u0648\u0645 \u0648\u062f\u064a\u0643\u0648\u0631\u0627\u062a \u062f\u0627\u062e\u0644\u064a\u0629 \u0648 \u0648\u0631\u0642 \u062c\u062f\u0631\u0627\u0646 \u0648\u062f\u064a\u0643\u0648\u0631\u0627\u062a \u0645\u0637\u0627\u0628\u062e \u0648\u0627\u0631\u0636\u064a\u0627\u062a \u0648\u062f\u064a\u0643\u0648\u0631\u0627\u062a \u062d\u0645\u0627\u0645\u0627\u062a \u064a\u0631\u0633\u0645\u0647\u0627 \u0645\u0635\u0645\u0645 \u0627\u0644\u062f\u064a\u0643\u0648\u0631 \u0641\u064a \u0627\u0644\u0639\u0642\u0627\u0631\u0627\u062a \u0648\u0627\u0644\u0645\u0646\u0627\u0632\u0644","_seopress_robots_index":"","footnotes":""},"categories":[119],"tags":[],"class_list":["post-19099","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-real-estate-finance"],"acf":{"amlak_post_excerpt":"","amlak_post_excerpt_source":{"label":"Amlak post excerpt","type":"text","formatted_value":""}},"featured_image_urls":{"full":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"thumbnail":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"medium":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"medium_large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"1536x1536":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"2048x2048":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"trp-custom-language-flag":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",18,12,false],"event-thumbnail":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"event-medium":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"event-large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false],"event-hero":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2015\/03\/\u0627\u0644\u0645\u062d\u064a\u0645\u064a\u062f-1.jpg",81,55,false]},"author_info":{"info":["\u0627\u0645\u0644\u0627\u0643 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u0629"]},"category_info":"<a href=\"https:\/\/amlak.net.sa\/en\/category\/finance-investment\/real-estate-finance\/\" rel=\"category tag\">\u062a\u0645\u0648\u064a\u0644 \u0639\u0642\u0627\u0631\u064a<\/a>","tag_info":"\u062a\u0645\u0648\u064a\u0644 \u0639\u0642\u0627\u0631\u064a","comment_count":"0","_links":{"self":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/19099","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/comments?post=19099"}],"version-history":[{"count":0,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/19099\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media\/3613"}],"wp:attachment":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media?parent=19099"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/categories?post=19099"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/tags?post=19099"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}