{"id":1981,"date":"2014-08-10T07:00:00","date_gmt":"2014-08-10T07:00:00","guid":{"rendered":"http:\/\/amlak.net.sa?p=1981"},"modified":"2014-08-10T07:00:00","modified_gmt":"2014-08-10T07:00:00","slug":"%d8%a8%d8%aa%d8%b1%d9%88%d8%b1%d8%a7%d8%a8%d8%ba-%d8%aa%d8%b9%d9%8a%d8%af-%d8%aa%d8%b4%d8%ba%d9%8a%d9%84-%d9%85%d8%ac%d9%85%d8%b9%d9%87%d8%a7-%d8%a7%d9%84%d8%b5%d9%86%d8%a7%d8%b9%d9%8a-%d8%a8%d8%b1","status":"publish","type":"post","link":"https:\/\/amlak.net.sa\/en\/1981\/","title":{"rendered":"PetroRabigh restarts its industrial complex in Rabigh"},"content":{"rendered":"<p>Rabigh Refining and Petrochemical Company (PetroRabigh) announced that it has resumed operations at all facilities within its industrial complex in Rabigh Province after a brief precautionary shutdown yesterday due to a stoppage in the air production unit for the control systems.<\/p>\n<p>The company said in an announcement published on the \u201dTadawul\u201d stock exchange website that the malfunction had been identified and repaired, the unit had been restored to full capacity on the same day, and all units of the complex had been restarted sequentially, with the complex expected to return to normal operations next Friday.The company estimates the financial impact to be a decrease in net income for the current quarter of approximately 30 million riyals.<\/p>","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading time: <\/span> <span class=\"rt-time\"> &lt; 1<\/span> <span class=\"rt-label rt-postfix\">Minute<\/span><\/span>Rabigh Refining and Petrochemical Company (PetroRabigh) announced the resumption of operations at all facilities within its industrial complex in Rabigh Province following a brief precautionary shutdown yesterday due to a failure in the air supply unit for the control systems. The company said in an announcement posted on the \u201dTadawul\u201d stock exchange website that the malfunction was identified and repaired, and the unit was restarted at full capacity on the same day, and operations resumed\u2026 <a title=\"PetroRabigh restarts its industrial complex in Rabigh\" class=\"read-more\" href=\"https:\/\/amlak.net.sa\/en\/1981\/\" aria-label=\"Read more about PetroRabigh Resuming Operations at Its Rabigh Industrial Complex\">Read more<\/a><\/p>","protected":false},"author":34,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"0","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"footnotes":""},"categories":[117],"tags":[],"class_list":["post-1981","post","type-post","status-publish","format-standard","hentry","category-industrial-logistics"],"acf":{"amlak_post_excerpt":"","amlak_post_excerpt_source":{"label":"Amlak post excerpt","type":"text","formatted_value":""}},"featured_image_urls":{"full":"","thumbnail":"","medium":"","medium_large":"","large":"","1536x1536":"","2048x2048":"","trp-custom-language-flag":"","event-thumbnail":"","event-medium":"","event-large":"","event-hero":""},"author_info":{"info":["\u0627\u0645\u0644\u0627\u0643 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u0629"]},"category_info":"<a href=\"https:\/\/amlak.net.sa\/en\/category\/markets\/industrial-logistics\/\" rel=\"category tag\">\u0635\u0646\u0627\u0639\u064a \u0648\u0644\u0648\u062c\u0633\u062a\u064a<\/a>","tag_info":"\u0635\u0646\u0627\u0639\u064a \u0648\u0644\u0648\u062c\u0633\u062a\u064a","comment_count":"0","_links":{"self":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/1981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/users\/34"}],"replies":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/comments?post=1981"}],"version-history":[{"count":0,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/1981\/revisions"}],"wp:attachment":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media?parent=1981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/categories?post=1981"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/tags?post=1981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}