{"id":67956,"date":"2024-08-07T10:04:37","date_gmt":"2024-08-07T07:04:37","guid":{"rendered":"https:\/\/amlak.net.sa\/?p=67956"},"modified":"2025-11-26T02:42:11","modified_gmt":"2025-11-26T02:42:11","slug":"%d8%a7%d9%84%d9%85%d8%b4%d8%b1%d9%88%d8%b9%d8%a7%d8%aa-%d8%a7%d9%84%d8%b9%d9%82%d8%a7%d8%b1%d9%8a%d8%a9-%d9%88%d8%a7%d9%84%d9%85%d8%aa%d8%b9%d8%ab%d8%b1%d8%a9","status":"publish","type":"post","link":"https:\/\/amlak.net.sa\/en\/67956\/","title":{"rendered":"6 requirements to address the trajectory of stalled off-plan real estate projects"},"content":{"rendered":"<div class=\"translation-block\">&lt;The General Real Estate Authority (GRA) has committed real estate developers to a number of steps to correct the course of their projects that have not achieved the completion rates stipulated in the timetable, as the draft \u201c<span style=\"color: #800000\"><strong><a style=\"color: #800000\" href=\"https:\/\/istitlaa.ncc.gov.sa\/ar\/Municipality\/rega\/realty\/Pages\/default.aspx\">Technical Guide to Address Stalled Real Estate Projects<\/a> and &lt;a style=&quot;color: #800000;&quot; href=&quot;https:\/\/istitlaa.ncc.gov.<\/a><\/strong><\/strong><\/span>\", published on a survey platform, contains comprehensive measures for each case, and invited interested parties to submit their feedback from August 4-19, 2024, noting that <a href=\"\/\/amlak.\"><span style=\"color: #800000\"><strong>The guide<\/strong> <\/span><\/a> is for projects covered by the provisions of the off-plan real estate sales and leasing system.<\/p> <p>\nRegarding the liquidation of an off-plan project, the guide indicated that the liquidation is done by mutual consent when one of the following cases is realized:<\/p> <p>\n<ul>\n<li>If the Authority deems the application of available default treatment methods to be futile.<\/li>\n<li>If the project is affected by government decisions related to suspensions.<\/li>\n<li>Change of land use of the project.<\/li>\n<\/ul>\n<p>The guide described stalled projects as those that were not completed within the specified period, including the additional period granted to the developer, or in which the implementation work was suspended for more than 180 days at any stage of the projects, and stalled projects were divided into two parts:<\/p> <p><span style=\"font-weight: bold\"><span style=\"font-weight: bold\"><span style=\"font-weight: bold\">.\n<p><span style=\"color: #800000\"><strong>Technical default: <\/strong><\/span><\/span> If the project is not completed within the specified period, including additional periods granted to the developer for technical, construction, or administrative reasons.<\/p> <p><span style=\"color: 1PP5T800\"><strong>Technical default: <\/strong><\/span><\/span>\n<p><span style=\"color: #800000\"><strong>Financial default: <\/strong><\/span> If the project is not completed within the specified period, including additional periods granted to the developer due to insufficient cash flow, poor marketing, or lack of funding sources.<\/p> <p><strong>The guide defines financial default as: <\/strong><\/span><\/p> <p><span>Financial default.\nThe guide identifies a number of key tools to address delays and defaults, as follows:<\/strong><\/p> <p><strong><\/p>\n<ul>\n<li>Appoint a qualified person to manage the relationship with the developer to address the default of the real estate project.<\/li> <\/li>\n<li>Checking and following up on the work of the project parties.<\/li>\n<li>Disburse funds from the real estate project escrow account, if necessary to correct the course of the project.<\/li> <li>\n<li>Requiring the developer to replace those responsible for the failure of the real estate project.<\/li>\n<li>Replacing a replacement developer.<\/li>\n<li>Return the amounts paid for the real estate project.<\/li>\n<\/ul>\n<p> <\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading time: <\/span> <span class=\"rt-time\"> &lt; 1<\/span> <span class=\"rt-label rt-postfix\">Minute<\/span><\/span>The General Real Estate Authority has required real estate developers to take a number of steps to get their projects back on track where they have not met the completion rates specified in the schedule. The \u201cTechnical Guide for Addressing Stalled and Delayed Real Estate Projects,\u201d published on the Isti'la platform, included comprehensive measures for each case, and the Authority invited interested parties to submit their views and comments during the period from April 4 to 19 \u2026 <a title=\"6 requirements to address the trajectory of stalled off-plan real estate projects\" class=\"read-more\" href=\"https:\/\/amlak.net.sa\/en\/67956\/\" aria-label=\"Read more about 6 requirements to address the stalled real estate project pipeline on the map\">Read more<\/a><\/p>","protected":false},"author":10,"featured_media":67958,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"0","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"amlak_video_sent":"","footnotes":""},"categories":[104],"tags":[],"class_list":["post-67956","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-legislation-and-regulations"],"acf":{"amlak_post_excerpt":"\u0627\u0644\u0647\u064a\u0626\u0629 \u0627\u0644\u0639\u0627\u0645\u0629 \u0644\u0644\u0639\u0642\u0627\u0631 \u0637\u0631\u062d\u062a \u062f\u0644\u064a\u0644\u0627\u064b \u0639\u0645\u0644\u064a\u0627\u064b \u0644\u0645\u0639\u0627\u0644\u062c\u0629 \u0627\u0644\u062a\u0639\u062b\u0631 \u0648\u0641\u062a\u062d\u062a \u0628\u0627\u0628 \u0627\u0644\u0645\u0644\u0627\u062d\u0638\u0627\u062a\u060c \u0645\u062d\u062f\u062f\u0627\u064b \u0633\u062a\u0629 \u0625\u062c\u0631\u0627\u0621\u0627\u062a \u062a\u0635\u062d\u064a\u062d\u064a\u0629.","amlak_post_excerpt_source":{"label":"Amlak post excerpt","type":"text","formatted_value":"\u0627\u0644\u0647\u064a\u0626\u0629 \u0627\u0644\u0639\u0627\u0645\u0629 \u0644\u0644\u0639\u0642\u0627\u0631 \u0637\u0631\u062d\u062a \u062f\u0644\u064a\u0644\u0627\u064b \u0639\u0645\u0644\u064a\u0627\u064b \u0644\u0645\u0639\u0627\u0644\u062c\u0629 \u0627\u0644\u062a\u0639\u062b\u0631 \u0648\u0641\u062a\u062d\u062a \u0628\u0627\u0628 \u0627\u0644\u0645\u0644\u0627\u062d\u0638\u0627\u062a\u060c \u0645\u062d\u062f\u062f\u0627\u064b \u0633\u062a\u0629 \u0625\u062c\u0631\u0627\u0621\u0627\u062a \u062a\u0635\u062d\u064a\u062d\u064a\u0629."}},"featured_image_urls":{"full":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2024\/08\/\u0627\u0633\u062a\u062b\u0645\u0627\u0631-\u0639\u0642\u0627\u0631\u064a-\u0639\u0642\u0627\u0631\u0627\u062a-\u0631-\u0645\u0632\u064a\u0629.jpg",818,470,false],"thumbnail":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2024\/08\/\u0627\u0633\u062a\u062b\u0645\u0627\u0631-\u0639\u0642\u0627\u0631\u064a-\u0639\u0642\u0627\u0631\u0627\u062a-\u0631-\u0645\u0632\u064a\u0629-150x150.jpg",150,150,true],"medium":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2024\/08\/\u0627\u0633\u062a\u062b\u0645\u0627\u0631-\u0639\u0642\u0627\u0631\u064a-\u0639\u0642\u0627\u0631\u0627\u062a-\u0631-\u0645\u0632\u064a\u0629-300x172.jpg",300,172,true],"medium_large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2024\/08\/\u0627\u0633\u062a\u062b\u0645\u0627\u0631-\u0639\u0642\u0627\u0631\u064a-\u0639\u0642\u0627\u0631\u0627\u062a-\u0631-\u0645\u0632\u064a\u0629-768x441.jpg",768,441,true],"large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2024\/08\/\u0627\u0633\u062a\u062b\u0645\u0627\u0631-\u0639\u0642\u0627\u0631\u064a-\u0639\u0642\u0627\u0631\u0627\u062a-\u0631-\u0645\u0632\u064a\u0629.jpg",818,470,false],"1536x1536":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2024\/08\/\u0627\u0633\u062a\u062b\u0645\u0627\u0631-\u0639\u0642\u0627\u0631\u064a-\u0639\u0642\u0627\u0631\u0627\u062a-\u0631-\u0645\u0632\u064a\u0629.jpg",818,470,false],"2048x2048":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2024\/08\/\u0627\u0633\u062a\u062b\u0645\u0627\u0631-\u0639\u0642\u0627\u0631\u064a-\u0639\u0642\u0627\u0631\u0627\u062a-\u0631-\u0645\u0632\u064a\u0629.jpg",818,470,false],"trp-custom-language-flag":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2024\/08\/\u0627\u0633\u062a\u062b\u0645\u0627\u0631-\u0639\u0642\u0627\u0631\u064a-\u0639\u0642\u0627\u0631\u0627\u062a-\u0631-\u0645\u0632\u064a\u0629.jpg",18,10,false],"event-thumbnail":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2024\/08\/\u0627\u0633\u062a\u062b\u0645\u0627\u0631-\u0639\u0642\u0627\u0631\u064a-\u0639\u0642\u0627\u0631\u0627\u062a-\u0631-\u0645\u0632\u064a\u0629-300x200.jpg",300,200,true],"event-medium":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2024\/08\/\u0627\u0633\u062a\u062b\u0645\u0627\u0631-\u0639\u0642\u0627\u0631\u064a-\u0639\u0642\u0627\u0631\u0627\u062a-\u0631-\u0645\u0632\u064a\u0629-600x400.jpg",600,400,true],"event-large":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2024\/08\/\u0627\u0633\u062a\u062b\u0645\u0627\u0631-\u0639\u0642\u0627\u0631\u064a-\u0639\u0642\u0627\u0631\u0627\u062a-\u0631-\u0645\u0632\u064a\u0629.jpg",818,470,false],"event-hero":["https:\/\/amlak.net.sa\/wp-content\/uploads\/2024\/08\/\u0627\u0633\u062a\u062b\u0645\u0627\u0631-\u0639\u0642\u0627\u0631\u064a-\u0639\u0642\u0627\u0631\u0627\u062a-\u0631-\u0645\u0632\u064a\u0629.jpg",818,470,false]},"author_info":{"info":["\u0627\u0645\u0644\u0627\u0643 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u0629"]},"category_info":"<a href=\"https:\/\/amlak.net.sa\/en\/category\/development-construction\/legislation-and-regulations\/\" rel=\"category tag\">\u0627\u0644\u062a\u0634\u0631\u064a\u0639\u0627\u062a \u0648\u0627\u0644\u0623\u0646\u0638\u0645\u0629<\/a>","tag_info":"\u0627\u0644\u062a\u0634\u0631\u064a\u0639\u0627\u062a \u0648\u0627\u0644\u0623\u0646\u0638\u0645\u0629","comment_count":"0","_links":{"self":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/67956","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/comments?post=67956"}],"version-history":[{"count":0,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/67956\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media\/67958"}],"wp:attachment":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media?parent=67956"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/categories?post=67956"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/tags?post=67956"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}