{"id":8606,"date":"2015-12-22T12:53:18","date_gmt":"2015-12-22T09:53:18","guid":{"rendered":"http:\/\/www.amlak.net.sa\/?p=8606"},"modified":"2015-12-22T12:53:18","modified_gmt":"2015-12-22T09:53:18","slug":"%d8%aa%d8%b4%d9%85%d9%84-10-%d8%a3%d8%a8%d8%b1%d8%a7%d8%ac-%d9%81%d9%86%d8%af%d9%82%d9%8a%d8%a9-%d9%8886-%d9%81%d9%8a%d9%84%d8%a7-%d9%88%d8%a3%d8%b3%d9%88%d8%a7%d9%82-%d8%ac%d8%a8%d9%84-%d8%b9","status":"publish","type":"post","link":"https:\/\/amlak.net.sa\/en\/8606\/","title":{"rendered":"Including 10 hotel towers, 86 villas and markets, Jabal Omar completes 96% of first phase projects"},"content":{"rendered":"<div class=\"translation-block\"><p dir=\"RTL\" style=\"text-align: justify;line-height: 18.0pt;background: white;direction: rtl;margin: 0in 0in 0in 12.0pt 0in\"><span lang=\"AR-SA\" style=\"font-size: 14.0pt;color: #33333333\">Jabal Omar Company revealed that it has completed the first phase of its projects by 96% and opened a number of hotels and commercial markets, and the phase consists of four podium bases, 10 hotel towers, 86 villas and residential units in addition to 10 upper villas with a built-up area of about 472 thousand square meters overlooking Ibrahim Al-Khalil Street<\/span><span dir=\"LTR\" style=\"font-size: 14.0pt;color:\">.<\/span><\/span><\/p>\n<p><span lang=\"AR-SA\" style=\"font-size: 14.0pt;color: #333333\">During the past year, the project's first hotel (Makkah Hilton Suites) was fully opened, the Marriott Makkah and Hyatt Regency Makkah were opened, and the two commercial markets in the two areas were completed<\/span><span dir=\"LTR\" style=\"font-size: 14.0pt;color: #333333\"><\/span><span dir=\"LTR\" style=\"font-size: 14.0pt;color: #333333\"> S1<\/span><\/span><span lang=\"AR-SA\" style=\"font-size: 14.0pt;color: #333333\">,\"&gt;<\/span><span dir=\"LTR\" style=\"font-size: 14.0pt;font-family:\">S2<\/span><\/span><span lang=\"AR-SA\" style=\"font-size: 14.0pt;font-family:\">The board report revealed the completion of the Hilton Convention Hotel during the coming period, and the Conrad Makkah Hotel during the second spring of 1437. The first phase projects were funded by the National Bank, consisting of two towers (each tower 20 floors) in the area<\/span><\/span><span dir=\"LTR\" style=\"font-size: 14.0pt;color: #333333\"> S2<\/span><\/span><span lang=\"AR-SA\" style=\"font-size: 14.0pt;color: #333333\">Facing Ibrahim Al-Khalil Street and consisting of (440).<\/span><\/span><\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading time: <\/span> <span class=\"rt-time\"> &lt; 1<\/span> <span class=\"rt-label rt-postfix\">Minute<\/span><\/span>Jabal Omar Company announced that it has completed 96% of the first phase of its projects, and a number of hotels and shopping malls have been opened. The phase consists of four podium bases, 10 hotel towers, 86 villas and residential units, as well as 10 penthouse villas with a total floor area of approximately 472,000 square meters overlooking Ibrahim Al-Khalil Street. Over the past year \u2026 <a title=\"Comprising 10 hotel towers, 86 villas, and markets, Jabal Omar completes 96% of its first phase projects.\" class=\"read-more\" href=\"https:\/\/amlak.net.sa\/en\/8606\/\" aria-label=\"Read more about 10 hotel towers, 86 villas, and markets are included\u2026 Jabal Omar completes 96% of the first phase projects\">Read more<\/a><\/p>","protected":false},"author":10,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"0","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"amlak_video_sent":"","footnotes":""},"categories":[145],"tags":[],"class_list":["post-8606","post","type-post","status-publish","format-standard","hentry","category-major-projects"],"acf":{"amlak_post_excerpt":"","amlak_post_excerpt_source":{"label":"Amlak post excerpt","type":"text","formatted_value":""}},"featured_image_urls":{"full":"","thumbnail":"","medium":"","medium_large":"","large":"","1536x1536":"","2048x2048":"","trp-custom-language-flag":"","event-thumbnail":"","event-medium":"","event-large":"","event-hero":""},"author_info":{"info":["\u0627\u0645\u0644\u0627\u0643 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u0629"]},"category_info":"<a href=\"https:\/\/amlak.net.sa\/en\/category\/vision-2030\/major-projects\/\" rel=\"category tag\">\u0645\u0634\u0627\u0631\u064a\u0639 \u0643\u0628\u0631\u0649<\/a>","tag_info":"\u0645\u0634\u0627\u0631\u064a\u0639 \u0643\u0628\u0631\u0649","comment_count":"0","_links":{"self":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/8606","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/comments?post=8606"}],"version-history":[{"count":0,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/8606\/revisions"}],"wp:attachment":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media?parent=8606"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/categories?post=8606"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/tags?post=8606"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}