{"id":87308,"date":"2014-05-03T07:00:00","date_gmt":"2014-05-03T07:00:00","guid":{"rendered":"http:\/\/amlak.net.sa?p=1876"},"modified":"2014-05-03T07:00:00","modified_gmt":"2014-05-03T07:00:00","slug":"%d8%a7%d9%83%d8%aa%d9%85%d8%a7%d9%84-%d8%a3%d9%83%d8%ab%d8%b1-%d9%85%d9%86-70-%d8%a8%d8%a7%d9%84%d9%85%d8%a7%d8%a6%d8%a9-%d9%85%d9%86-%d8%a3%d8%b9%d9%85%d8%a7%d9%84-%d9%85%d8%b4%d8%b1%d9%88%d8%b9","status":"publish","type":"post","link":"https:\/\/amlak.net.sa\/en\/87308\/","title":{"rendered":"More than 70 percent of the work on the largest financial complex in Riyadh has been completed"},"content":{"rendered":"<div class=\"translation-block\"><p>More than 70 percent of the work on Riyadh\u2019s largest financial complex has been completed<br \/>\nRiyadh\u2014Follow-up<br \/>\n The King Abdullah Financial District project is considered a major economic hub and the largest financial complex in the region. 71% of the project\u2019s construction has been completed; the project, which began seven years ago, covers an area of 1.6 million square meters north of Riyadh, making it the largest financial complex in the Middle East, comparable to its global counterparts, foremost among them the \u201cLondon Canary Wharf Financial Center,\u201d which was built on an area of 345,000 square meters.<\/p>\n<p>Economic Complex<br \/>\nThe center is designed as an integrated economic system comprising 127 investment towers, including a 385-meter-tall tower serving as the headquarters of the Capital Market Authority and a stock exchange building. The King Abdullah Financial District works through the establishment of the \u201cFinancial Academy\u201d to meet local and global demand for qualified professionals in the fields of finance and modern investment management, It also aims to train Saudi university graduates, as well as graduates of the Custodian of the Two Holy Mosques Scholarship Program\u2014who are Saudi nationals specializing in management, economics, and finance programs at the world\u2019s most prestigious universities.<br \/>\nThe Center, estimated to cost 28 billion riyals, is considered a powerful boost to the national economy, as it is designed to be a specialized hub where major global financial firms converge in a cultural project that incorporates the latest advancements in modern architecture and design, making Riyadh a focal point for real estate investors.<br \/>\nThe information and communications technology systems at the King Abdullah Financial Center are based on next-generation (NGN), and utilize Internet protocols. All of the center\u2019s technical services operate via unified networks and highly precise, intelligent systems, which are managed and controlled from high-security information control centers.<br \/>\nThe Center\u2019s Networks<br \/>\nWe are currently implementing the first phase, in which the center features a number of attractions and recreational areas carefully and skillfully designed to serve as a respite and a recreational and educational hub for the complex\u2019s residents and visitors; such as Al-Wadi Park, the Water Museum, the Conference Center, the Built Environment Museum, the Earth Climate Center, the Science Museum, the Wellness and Recreation Club, the Interactive Children\u2019s Museum, and other educational and recreational facilities.<br \/>\nThe center\u2019s services also include dedicated networks for drinking water, fire protection (21,000 meters), irrigation (17,000 meters), and sewage (11,000 meters), as well as a 15,600-meter stormwater drainage network, 25,000 meters of cooling pipes, and 12,600 meters of automated waste management system pipes.<br \/>\nThe project includes a network of electrical works comprising a medium-voltage network 116,000 meters long, a street lighting network 18,800 meters long, and a monorail running on a circular track around the project with a total length of 3.6 kilometers, passing through six stations located within the attraction complexes. It consists of six trains, each comprising two cars with a capacity of 172 passengers per car, transporting 3,000 passengers per hour.<br \/>\nThe Center\u2019s Towers<br \/>\nThe project also includes a number of pedestrian bridges totaling 11,400 meters in length to connect the towers, allowing all users to move between them, as well as two central cooling stations with a capacity of 100,000 metric tons, which are among the largest cooling plants in the world, along with the creation of walking paths and parks\u2014known as \u201cAl-Wadi\u201d\u2014covering an area of 67,500 square meters.<br \/>\nThe King Abdullah Financial District project continues to set new standards of excellence, as waste is collected via an automatic vacuum system with a capacity of 145 metric tons per day, and recycled using one of the most advanced and modern waste disposal systems currently in use. Additionally, four substations have been built to supply the center with 480 megawatts of electricity and provide services to the project, such as \u201cthe National Water Company, the Saudi Electricity Company, and telecommunications companies.\u201d<br \/>\nThe center features an estimated 1,660,000 square meters of office space, 153,000 square meters of hotel space, 310,000 square meters for commercial use, and approximately 240,000 square meters for investment attractions.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading time: <\/span> <span class=\"rt-time\"> 2<\/span> <span class=\"rt-label rt-postfix\">Minutes<\/span><\/span>More Than 70 Percent of Construction Work Completed on Riyadh\u2019s Largest Financial Complex Riyadh\u2014Follow-up: The King Abdullah Financial Center project is considered a major economic hub and the largest financial complex in the region, 71% of the project has been completed. The project, which began seven years ago on a 1.6-million-square-meter site north of Riyadh, will establish the largest financial complex in the Middle East within the capital\u2026 <a title=\"More than 70 percent of the work on the largest financial complex in Riyadh has been completed\" class=\"read-more\" href=\"https:\/\/amlak.net.sa\/en\/87308\/\" aria-label=\"Read more about more than 70 percent of work on the largest financial project in Riyadh has been completed\">Read more<\/a><\/p>","protected":false},"author":34,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"0","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"amlak_video_sent":"","footnotes":""},"categories":[145],"tags":[],"class_list":["post-87308","post","type-post","status-publish","format-standard","hentry","category-major-projects"],"acf":{"amlak_post_excerpt":"","amlak_post_excerpt_source":{"label":"Amlak post excerpt","type":"text","formatted_value":""}},"featured_image_urls":{"full":"","thumbnail":"","medium":"","medium_large":"","large":"","1536x1536":"","2048x2048":"","trp-custom-language-flag":"","event-thumbnail":"","event-medium":"","event-large":"","event-hero":""},"author_info":{"info":["\u0627\u0645\u0644\u0627\u0643 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u0629"]},"category_info":"<a href=\"https:\/\/amlak.net.sa\/en\/category\/vision-2030\/major-projects\/\" rel=\"category tag\">\u0645\u0634\u0627\u0631\u064a\u0639 \u0643\u0628\u0631\u0649<\/a>","tag_info":"\u0645\u0634\u0627\u0631\u064a\u0639 \u0643\u0628\u0631\u0649","comment_count":"0","_links":{"self":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/87308","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/users\/34"}],"replies":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/comments?post=87308"}],"version-history":[{"count":0,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/87308\/revisions"}],"wp:attachment":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media?parent=87308"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/categories?post=87308"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/tags?post=87308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}