{"id":9807,"date":"2016-03-23T13:48:20","date_gmt":"2016-03-23T10:48:20","guid":{"rendered":"http:\/\/www.amlak.net.sa\/?p=9807"},"modified":"2016-03-23T13:48:20","modified_gmt":"2016-03-23T10:48:20","slug":"%d8%b3%d9%84%d9%8a%d9%85%d8%a7%d9%86-%d8%a7%d9%84%d8%b1%d8%a7%d8%b4%d8%af-%d8%aa%d9%85-%d8%a5%d9%86%d8%ac%d8%a7%d8%b2-11-%d9%85%d9%86-%d8%a3%d8%b9%d9%85%d8%a7%d9%84-%d8%a7%d9%84%d8%a8%d9%86%d8%a7","status":"publish","type":"post","link":"https:\/\/amlak.net.sa\/en\/9807\/","title":{"rendered":"Suleiman Al Rashid: 11% of construction work completed for Mada Residences next to The Dubai Mall"},"content":{"rendered":"<div class=\"translation-block\"><p>Artar Real Estate Development\u2014a subsidiary of Abdulrahman Saad Al Rashid &amp; Sons\u2014has completed 11% of the construction work on the luxury \u201cMada Residences\u201d tower project in Downtown Dubai, while construction has reached the third floor of the tower\u2019s main block, which comprises 36 floors.<\/p>\n<p>The overall construction of the tower coincides with the closing of the first sales phase for the project, which features 193 luxury apartments of various sizes, in a setting that meets all residents\u201c needs, including a fitness club with an outdoor rooftop pool and a multipurpose hall, All residential units in the project, located adjacent to the Dubai Mall, feature floor-to-ceiling glass views to ensure excellent lighting, ventilation, and a sense of spaciousness throughout the apartments, which start at 82 square meters.<\/p>\n<p>Suleiman Abdulrahman Al Rashid, CEO of Artar Real Estate Development LLC, said: \u201dAll construction work is proceeding according to schedule and is expected to be completed in approximately 26 months.\u00ab<\/p>\n<p>Since sales began, the \u00bbMada Residences\u201d tower project has seen significant interest from investors, which reflects the project\u2019s unique features. Apartments were offered in three initial installments of 30% during the first year, while the final installment of 70% will be paid upon project completion.<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p><span class=\"span-reading-time rt-reading-time\" style=\"display: block;\"><span class=\"rt-label rt-prefix\">Reading time: <\/span> <span class=\"rt-time\"> &lt; 1<\/span> <span class=\"rt-label rt-postfix\">Minute<\/span><\/span>Artar Real Estate Development\u2014a subsidiary of Abdulrahman Saad Al Rashid &amp; Sons\u2014has completed 11% of the construction work on the luxury \u201cMada Residences\u201d tower project in Downtown Dubai, while construction has reached the third floor of the tower\u2019s main block, which comprises 36 floors. The overall construction of the tower coincides with the closing of the first sales phase for the project, which includes 193 \u2026 <a title=\"Sulaiman Al-Rashid: 11% of construction work has been completed for the \u201cMada Residences\u201d project next to Dubai Mall\" class=\"read-more\" href=\"https:\/\/amlak.net.sa\/en\/9807\/\" aria-label=\"Read more about Sulaiman Al-Rashid: 11% construction works completed for the \u201cMedi Residences\u201d project next to Dubai Mall\">Read more<\/a><\/p>","protected":false},"author":10,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"0","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"amlak_video_sent":"","footnotes":""},"categories":[123],"tags":[],"class_list":["post-9807","post","type-post","status-publish","format-standard","hentry","category-building-materials-techniques"],"acf":{"amlak_post_excerpt":"","amlak_post_excerpt_source":{"label":"Amlak post excerpt","type":"text","formatted_value":""}},"featured_image_urls":{"full":"","thumbnail":"","medium":"","medium_large":"","large":"","1536x1536":"","2048x2048":"","trp-custom-language-flag":"","event-thumbnail":"","event-medium":"","event-large":"","event-hero":""},"author_info":{"info":["\u0627\u0645\u0644\u0627\u0643 \u0627\u0644\u0639\u0642\u0627\u0631\u064a\u0629"]},"category_info":"<a href=\"https:\/\/amlak.net.sa\/en\/category\/development-construction\/building-materials-techniques\/\" rel=\"category tag\">\u0645\u0648\u0627\u062f \u0648\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621<\/a>","tag_info":"\u0645\u0648\u0627\u062f \u0648\u062a\u0642\u0646\u064a\u0627\u062a \u0627\u0644\u0628\u0646\u0627\u0621","comment_count":"0","_links":{"self":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/9807","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/comments?post=9807"}],"version-history":[{"count":0,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/posts\/9807\/revisions"}],"wp:attachment":[{"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/media?parent=9807"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/categories?post=9807"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amlak.net.sa\/en\/wp-json\/wp\/v2\/tags?post=9807"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}