Upon completion of pouring the concrete for the upper tank canopy and dismantling its wooden formwork after two weeks, the contractor will have completed the construction of the building with regard to the structural framework stage.
The contractor is instructed to remove all his timber and materials from the site. After that, all spaces and rooms are reviewed to ensure that no work remains related to the contractor, even if it is minor, and the contractor is obligated to carry it out according to the plans.
Upon confirming that there are no related works for the contractor, coordination is made with an engineering office specializing in surveying work to come to the site and carry out the final measurement of the structural framework works (“skeleton”). The measurement must be done on the ground and the costs of the work carried out must be calculated according to the contract signed with the implementing party (“the contractor”). It is recommended that the measurement be done in the presence of the owner or his representative and the contractor as well.
The contractor’s remaining dues, if any, shall be disbursed according to the final measurement, provided that the “contractor” submits a final clearance to the owner printed on the official letterhead of the implementing entity and stamped, stating that the contractor has completed the project works in accordance with the plans, the contract and the project specifications and has received all his financial dues and has no right to claim in the future. This clearance shall also be signed by the owner and stating that he has received the project implemented by the contractor in accordance with the plans, the contract and the project specifications and has no right to claim from the implementing entity “contractor” any work in the future.
With this, thanks be to God Almighty, we have completed the structural framework stage “skeleton”. Our reference during the previous series of episodes was the book Stages of Building Residential Villas, Part One “Structural Framework Stage “skeleton”.
God willing, in the upcoming episodes of this series we will discuss the steps for finishing buildings, and we are happy to receive all inquiries and consultations, which will be answered through the "Readers' Question" in each episode.
Readers' question
Is natural or artificial stone considered a heat insulator, and what are the best methods for installing stone?
It is unfortunate that some people believe that stone, whether natural or artificial, insulates heat. This is a misconception, and thermal insulation systems for walls cannot be dispensed with if stone is present. The ideal method for cladding facades with natural stone is to install it mechanically using screws and galvanized iron angles. It is not recommended to install the stone using cement mortar, as the stone becomes prone to falling, God forbid, and this is unfortunately frequently observed.