Construction problems arise from not choosing the right land for construction, such as the land having water leaks during excavation and foundation work and the water tank. We notice this a lot in the lands, which forces the owner or real estate developer to extract the water to the outside in order to work on excavating the foundations and digging the water tank and start work on reinforcement and pouring concrete without water leakage, which causes future problems for the cement and reinforcing steel, resulting in separation between the steel and the concrete and producing rust and corrosion over the years, without taking technical precautions and following engineering standards when establishing the building.
The unsuitability of the structural and architectural design occurs when the owner or the person responsible for implementation neglects the design, either wholly or partially, such as:
Negligence in the concrete mix design and in conducting tests on sand, water and cement. Failure to adhere to technical specifications and engineering plans during implementation in a manner contrary to the law.
Example: Using bad materials that are unsuitable and do not conform to specifications, such as weak reinforcing steel, especially in the construction of foundations, columns, roof slabs, underground tanks, and external courtyards, so as not to cause subsidence over time, and making mesh for the corners of rooms so that future cracks and fissures do not appear, even during painting, which is clearly visible due to the neglect in establishing them.
Cement plastering in construction
The rough cement (scrap) was applied to the walls and sprayed with water several times a day to make it strong and not prone to crumbling and rough so that it would adhere to the plastering work and spray it the next day to make it strong and cohesive. Before that, the building was done with the appropriate block and the appropriate size (20) is better, or red block, but it is more expensive. Insulation was done with cork boards and sprayed twice the next day, morning and evening. Mesh was made in the corners everywhere in the building to prevent cracks.
Most engineers are satisfied with a visual inspection of materials without conducting tests on them. Here, greater attention should be paid to those that go into concrete, such as water, sand, reinforcing steel, and usable cement that has not been stored for a long time or exposed to rain in warehouses.
Installing high-quality electrical and plumbing fixtures to prevent future problems such as electrical short circuits or water leaks throughout the building.
The focus should be on the work of tiling the building and not reducing the cement so that a sound does not appear when hitting with the hand, whether on the walls or floors. We notice this defect frequently. Also, not making slopes when tiling the bathrooms causes water to accumulate in an inappropriate manner.