The House of a Lifetime: Step by Step – Episode (15)

Posted in

After the work of isolating the mud from inside and outside is completed, the site is cleaned and all debris, including wood pieces, are removed. The grave is delivered near the site, and care is taken to avoid harming neighbors. It is advisable to use soft red sand that is free of stones in the work of burying the mud at the site.

Insecticide against white ants (moth) is sprayed near the entrance and exit of the room and on all sides of the rooms from the inside. The insecticide comes in a powder packaged in bags or liquid. The powder is sprayed by workers with the necessary protective masks when spraying. The liquid insecticide is sprayed by a specialized company using a pump. If you wish to use the liquid insecticide, the site must be buried immediately after the spraying is completed within a period not exceeding 24 hours.

For the enclosure, the discussion continues regarding the work of the medina in the villas that do not have a basement (douroum). Work on the burial begins with a small or medium-sized shovel; it is absolutely forbidden to use a large-sized shovel, as it can cause damage to the medina. The medina is buried completely from the inside, leaving a space of 10 to 12 cm from the top; the medina is then buried within the remaining space. From the outside, the medina is buried at the same height as the height of the wall of the fence, leaving a space of 10 cm from the top that is not buried.

The burial mound is leveled from the inside by workers; after that, the mound is filled with water; after the water dries, the mound is covered with lead; the size of the lead should be medium; the foreman of the lead must be assured that it will not touch or hit the mound; then the plumber extends and establishes the gutter inside the kitchen, ensuring that the location is suitable; it should also be close to the location of the washing machine inside the kitchen; the drainage pipes for the chair and the gutter are also installed in the floor of the bathrooms; a separate gutter must be installed for the guest washroom (the guest washroom), which is located outside the bathrooms; since the proximity of the gutter to the washroom reduces the chances of any blockage, if God forbid, a leak can be repaired with minimal effort; the tiling of the bathroom floors can be postponed until after the bones have healed.

Readers' Question

After the base wood has been removed, it was found that there are gaps in the joists; the reinforcement steel is visible through these gaps. What is the solution to this, given that the contractor has instructed to fill the gaps with a cement mixture that is prepared on site?

When gaps appear in the concrete (seeding), it is necessary to hire one of the specialized entities to treat the concrete. This way, the nesting process can be observed in its natural state and the appropriate method for its treatment can be determined. However, the contractor has previously instructed us that his function does not extend beyond implementation only; these technical matters are entrusted to the experts from specialized companies and institutions.