The Royal Commission for Riyadh City announced the completion of the main works for the Thumamah Road bridge at its intersection with Prince Mohammed bin Salman Road, and its opening to traffic starting at 6:00 AM on Friday, October 9, after about six months of construction work.
The bridge was constructed in a vital location with high traffic volume and limited work space, adjacent to the Riyadh Metro pylons. Its construction required precise lifting and installation of structural elements weighing over 3,200 tons across Prince Mohammed bin Salman Road, while traffic continued to flow around the project site. The work was completed with a safety record free of injuries and accidents, maintaining smooth traffic flow and minimizing the impact on road users. Construction of the new bridge began on April 1, 2026, following the demolition of the previous bridge, and included foundation work, structural work, installation of bridge elements, and final paving, lighting, and finishing touches.

The Thumamah Road Bridge is approximately 400 meters long and 20 meters wide, featuring six main lanes (three in each direction) and four service lanes (two in each direction). The bridge facilitates east-west traffic flow along Thumamah Road, easing access to the King Abdullah Financial District, major thoroughfares, and surrounding residential and commercial areas. The service lanes help separate through traffic from local traffic, reducing congestion at the intersection and improving traffic flow, thus enhancing the city's road network connectivity.
The bridge is part of the development works of the Thumamah Road axis, which extends from Sheikh Jaber Al-Sabah Road in the east to King Khalid Road in the west, with a length of 24 kilometers. The development works of the axis include 17 bridges, 10 tunnels and 3 intersections. Work is continuing at a rapid pace at the intersection of Thumamah Road with King Abdulaziz Road, in addition to a number of sites along the axis, to enhance the efficiency of the road network and improve the quality of transportation in the capital.
The development of the Thumamah Road axis is part of the program to develop the ring roads and main roads in Riyadh, which includes more than 22 projects within four groups, and aims to develop more than 500 kilometers of the road network throughout the city, thereby increasing its capacity and enhancing the connectivity of its transportation network.
Read also:
Expropriation of properties conflicting with Riyadh road development begins



