الأسقف المستعارة للمبنى (الجبس وخلافه) خلال مرحلة تنفيذها . If there is any conflict between the ductwork and the plans, it must be stopped and referred to the designer, all false ceilings are implemented in the building with the exception of restrooms and all spaces where wall tiles will be installed, such as restrooms, laundry rooms and kitchens. Bathrooms, laundry rooms, kitchens and so on, as the installation of plaster for bathroom ceilings before wall tiles causes the appearance of some distortions and observations when the plaster meets the tiles, so it must be emphasized to postpone the implementation of borrowed ceilings for bathrooms until after the implementation of wall tiles, as will be discussed later.
It is good during this stage to start implementing lighting openings for borrowed ceilings, the original that the lighting openings are implemented according to an approved plan prepared by a specialized lighting agency or by the interior designer of the project, the size of the lighting openings must be determined as several sizes are available, a sample is brought for each size To note that lighting is a science in itself and has a great impact on the beauty of the spaces in the building, so we are keen to prepare a special lighting plan in accordance with the nature of the use of each space and in proportion to the design of the false ceilings, so we are keen to prepare a special lighting plan in accordance with the nature of the use of each space and in proportion to the design of borrowed ceilings.
Upon completion of the implementation of all false ceilings for all spaces in the building, the site is thoroughly cleaned and the importance of removing the remnants of gypsum and others from the floors, as the next stage will be preparing to start tile work for all floors inside the building as follows, the entity in charge of the air conditioning work begins to extend the air conditioner drainage pipes that were established inside the walls before the lime phase, as these pipes are connected to the inside of the bathrooms or the nearest It is good to use 1-inch pipes to drain the air conditioners during this stage, and this undoubtedly avoids blockages, to surround the toilets located on the upper floors or on the ceiling of the basement whose floors will be waterproofed, the air conditioner drainage pipes are connected to them with a length of 50 cm only, and they are not connected to the water heater until the waterproofing is completed in the future, as will be mentioned.
At the same time, the plumber makes drainage extensions and so on, especially the drainage for sinks, where they are connected to the inside of the toilets or their tanks, taking into account the toilets that will be implemented waterproofing for their floors, so these extensions are not connected inside the tanks until after the waterproofing in the future, and the electrician
Attention! Some buildings did not use a termite control pesticide before the implementation of the cleaning mold for the floor of the building during the structural structure phase (bone), and since termites are a threat to investments in buildings, they destroy all wooden objects, furniture and doors as well, so it is recommended during this stage and before the implementation of floor tiles inside the building, it is advisable to contract a specialized Contracting with one of the agencies specialized in termite control, where holes are made in the floor concrete for the ground floor only and about 50 cm deep and a liquid substance is injected inside these holes to prevent the danger of termites, the distance between the holes does not exceed 60 to 80 cm and is on the perimeter of the rooms only, provided that the implementation is carried out by a specialized agency with the necessity of providing a guarantee.