Jazan Municipality is currently seeking to implement the outputs of the strategic plan for rainwater drainage in Jizan city and all governorates of the region, with the aim of enhancing the capacity of the main stations to deal with increasing amounts of rainfall and reduce water accumulation, which contributes to improving the quality of life for citizens.
The number of completed projects in the field of rain and floods amounted to five projects at a total cost of (41,000,000 riyals). <The number of completed projects in the field of rain and floods amounted to five projects at a total cost of (41,000,000) riyals, including two projects to increase the capacity of the first rainwater drainage station in Jizan city, the construction of the second station in the city at a cost of (18,000,000) riyals, the implementation of three projects to expand rainwater drainage networks with a length of "14" kilometers, and the implementation of protections to prevent the quality of life for citizens. kilometers, and the implementation of protections to prevent flood risks in Jizan city and the governorates at a cost of (23,000,000) riyals.
<It indicated that it is working on the implementation of 14 projects at a total cost of (345,000,000) riyals, including three projects to construct the third, fourth and fifth rainwater drainage stations in Jizan city at a cost of (40,000,000) riyals, in addition to operational projects at a cost of (15,000,000) riyals, and is also implementing three projects to expand drainage networks in Jizan city and governorates to reduce critical locations for rainwater accumulation at a cost of (45,000,000) riyals, and is also implementing three projects to expand drainage networks in Jizan city and governorates to reduce critical locations for rainwater collection at a cost of (45,000,000),(45,000,000 riyals), in addition to the construction of a storm water drainage station and network, which includes the construction of two stations and a 16-kilometer drainage network to cover the northern neighborhoods of Jizan city at a cost of (195,000,000) riyals, and the construction of six projects to prevent flood risks in Jizan city and governorates, including ferries and retaining walls, at a cost of (47,000,000) riyals.
The Municipality emphasized that these projects reflect its commitment to strengthening infrastructure, providing a safe and sustainable environment for citizens, and facing climatic challenges, which contributes to ensuring the safety of residents and improving the quality of life in the region, noting that these projects will contribute to achieving sustainable development and promoting environmental stability, in line with the Kingdom's Vision 2030.
The Municipality stressed that these projects will contribute to achieving sustainable development and enhancing environmental stability, in line with the Kingdom's Vision 2030.








