إعلان
OMAINTEC

Deadline for bids for Riyadh Metro Line 7 extended to September

The Royal Commission for Riyadh City postpones the receipt of tenders for the design and construction of the 65-kilometer, 19-station Line 7.

Riyadh train

Posted in

The Royal Commission for Riyadh City has decided to extend the deadline for qualified companies and consortia to submit their bids for the design and construction of Line 7 of the Riyadh Metro project, with the new deadline being September 2025, after it was set for June of the same year, according to the specialized magazine "MEED".

Line 7 is one of the most prominent new expansions in the Riyadh Metro network, as it is planned to connect a number of vital projects and areas in the capital, including the Qiddiya entertainment city, King Abdullah Gardens, King Salman Park, Misk City, and all the way to Diriyah Gate.

The total length of Line 7 is approximately 65 kilometers, of which 47 kilometers are underground and 19 kilometers are above ground, and it includes 19 stations, distributed as 14 underground stations and 5 above ground stations.

This line represents a qualitative addition to the Riyadh Metro project, which was inaugurated by the Custodian of the Two Holy Mosques, King Salman bin Abdulaziz Al Saud, in November 2024, as it is the backbone of the city’s public transport network, within the major transport projects that the Kingdom is witnessing.

His Royal Highness Crown Prince and Prime Minister Prince Mohammed bin Salman bin Abdulaziz has previously stated that the project is not viewed merely as a means of transportation, but as a major contributor to improving the quality of life in the capital, in line with the objectives of Saudi Vision 2030.

The Riyadh Metro project is being implemented under the umbrella of the King Abdulaziz Public Transport Project, an ambitious project that includes six main lines with a total length of 176 kilometers distributed across 85 stations, covering various vital, residential and commercial areas of the city, and connecting them to strategic locations such as King Khalid International Airport, King Abdullah Financial Center, major universities and downtown Riyadh.

The following are the main routes of the existing Riyadh Metro network:

  • Line 1 (Blue): Al-Ulya – Al-Batha – Al-Hair axis, 38 kilometers long
  • Line 2 (Red): King Abdullah Road, 25.3 kilometers long
  • The third line (orange): Madinah Road – Prince Saad Bin Abdulrahman Al Awwal Road, with a length of 40.7 kilometers
  • Line 4 (yellow): King Khalid International Airport Road axis, 29.5 kilometers long
  • Line 5 (Green): King Abdulaziz Road, 12.9 kilometers long
  • Line 6 (Purple): Abdul Rahman Bin Auf Road – Sheikh Hassan Bin Hussein Bin Ali Road, with a length of 29.7 kilometers