The Regulation amending the Saudi Building Code has established that the designer, supervisor, and executor are fully liable to the owner for any structural damages that appear during the first ten years from the date of delivery of the building. This warranty includes cases of total or partial demolition, hidden defects that may affect the safety and sustainability of the building.
Non-waivable legal responsibility
The new amendments emphasize that this responsibility remains and continues even if the defect is caused by the nature of the soil, and those responsible are not exempt from it even if the employer previously approved the implementation of defective buildings. If the designer's role is limited to drawing up plans without supervision, he is solely responsible for the defects arising from the design.
The new amendments emphasize that this liability continues even if the defect is caused by the nature of the soil.
Nullity of “disclaimer” clauses The regulation cuts off any attempts at legal circumvention, as it clearly stipulates that any agreement or condition aimed at exempting the contractor or designer from the warranty or reducing its duration is null and void, ensuring full protection of the owners" rights.
Nullity of any agreement or condition aimed at exempting the contractor or designer from the warranty or reducing its duration.
Scope of application and timeline The code requirements apply to all construction works in the public and private sectors.
The code requirements apply to all construction works in the public and private sectors, to include the design, implementation, operation, and maintenance phases. The system also extends to existing buildings in cases of renovation, expansion, or change of use, according to the approved timeline for the phases of implementation.



