After a long wait and anticipation, the heavy shadow cast over the real estate market revealed the full vision of the white land fee system approved by the Council of Ministers on June 13, 2016, based on what was submitted by the Minister of Housing and the recommendation of the Council of Economic Affairs and Development.
As time went by, the cloud of uncertainty surrounding the new system gradually began to dissipate with each step the ministry took to implement the decision in an easy way that would not overburden landowners and give them the opportunity to think about adjusting their situation. Especially since the decision took a long time to study and scrutinize, even prompting some to spread false news and rumors about postponing the system or the existence of exceptions. However, it seems that the Ministry of Housing was prepared with its mechanisms and technologies, as it provided an electronic window for registering and recording land and established a mechanism for evaluating land, starting with the large cities (Riyadh, Jeddah, and the city of Dammam).
At the end of last week, the Ministry of Housing began issuing bills for Riyadh’s land plots, which sources indicated numbered 245 and covered an area of over 100 million square meters. This move settled the controversy and removed the veil, and through the clarification it provided through the system’s portal or the published notices, which eliminated the concerns that were plaguing the land owners; this was due to the fairness of the price assessment of the targeted land plots, and several factors were taken into account, the most important of which was the location of the land according to the determined per-meter price; the competent committees for the assessment did well when they set a valuation for the services. Basic and important facilities, where 3.5% of the land value is deducted if there is no infrastructure for communication and drainage of floods and rain, and 3.6% if it is not prepared to handle the flow of water and rain; and 5% if there is no educational infrastructure. This total deducted from the land value is 12.1%; this is the actual and final valuation of the land, and then the fee value is calculated at 2.5% of this price; after issuing the invoice and sending it to the owner or owners, the owners have two options: paying the due amount within 12 months or developing the land.
The Ministry of Housing applies this system in four stages, which are: the first stage, which concerns lands that are not developed and have an area of ten thousand square meters or more, located within the range determined by the Ministry. The second stage includes developed lands belonging to a single owner in one approved plan, while the third stage includes developed lands belonging to a single owner in one approved plan, whose area exceeds five thousand square meters; the fourth stage includes developed lands belonging to a single owner in one city, provided that the total area exceeds ten thousand square meters.



