Conditions for obtaining a building permit and required documents

Building license via Baladi platform

Posted in

It is one of the e-services provided by the Kingdom of Saudi Arabia, through which citizens can inquire about the extraction of رخصة البناء التي تمنحها وزارة الشؤون البلدية through a unified national platform “Baladi”, where individuals and institutions in the Kingdom can search for building permits by ID number electronically.

Conditions for obtaining a building permit

The Ministry of Municipal and Rural Affairs and Housing has announced several conditions for the procedures for obtaining a building permit, in order to maintain security for housing, and the set of conditions are as follows

  • Get a building site validity form.
  • Full compliance with the Saudi Building Plans Code.
  • Submitting an engineering plan for the intended construction.
  • Pay the building license fee.
  • Compliance with all security and architectural regulations.
  • Compliance with the detailed engineering plan of the approved building permit.
  • Providing information about the building site.
  • Compliance with the setbacks contained in the conditions of the granted building permit.
  • Attach the Building Requirements Audit Form from the engineering consultant's office.
  • Preserve neighbors" consent and privacy by using architectural setback solutions.
  • Citizens are required to obtain a construction and operation permit document before starting.
  • Compliance with the requirements for high-rise construction over 12 stories in height.

Documents for obtaining a building permit

A citizen can Extract a building certificate from the Saudi Municipalities and Urban Planning Affairs can bring a number of supporting documents, as follows:

  • Documents belonging to the owner of the building owner.
  • Copy of the building ownership originals.
  • Document of materials and specifications used in the construction.
  • Building services approvals (electronic approval).
  • Site plan and exterior paint sample.
  • Copy of building permit attachments.
  • Copy of the survey report (croquet).
  • Supervisory Technical Consultant Report.
  • Title deed and all documents attached to the property assets.
  • A copy of the advertising license.
  • Engineering plans approved by the consultant.
  • No-objection permission document from the electricity company.
  • Payment of the required fees.