More than 271 thousand cubic meters of construction waste removed in Dammam metropolis

Removing construction and demolition debris

Posted in

Eastern Province Municipality within the program to address visual distortion and improve the urban landscape in Dammam, from September 15, 2022 to March 1, 2023, has completed fencing under construction buildings with a length of 5.891 linear meters, 271,694 cubic meters of building waste, 5613 concrete barriers, 2920 light poles, and 508 damaged cars from different neighborhoods of the metropolis."

The Municipality repaired and repaired 2,920 light poles and removed 508 damaged cars from different neighborhoods of the metropolis. <The Municipality repaired 38,272 linear meters of street potholes, painted 81,447 linear meters of sidewalks, repaired 226 electrical transformers, removed 621 illegal billboards, repaired and rehabilitated 406,739 square meters in parks and children's playgrounds, repaired 69 building and shop facades, and treated 3.024 cleanliness containers, removing 66 informal shelters, rest houses and camps, 32 illegal canopies and hangars, planting 884,913 trees and seasonal flowers, erasing 4,526 linear meters of graffiti, repairing 216 signs for street names and building numbers, in addition to seizing 114 street vendors.