Al-Baha Municipality detects 142 violations of Saudi building code requirements since the beginning of 2024

Municipality addressed 131 violations and 11 are still in the corrective period after more than 85 inspection tours

Posted in

<Since the beginning of 2024, Baha Municipality has carried out more than 85 inspection tours on facilities and buildings across the region to follow up the requirements of the Saudi Building Code, resulting in the seizure of 142 violations of the requirements of the code.

The Municipality clarified that the total number of violations that have been addressed is 131 violations, and 11 violations in the corrective period.

The Municipality stressed the need to follow the requirements of the Saudi Building Code. The Municipality stressed the need to apply the requirements and requirements of the building code to control construction work in the public and private sectors, including building design, implementation, operation, maintenance and modification, focusing on the safety of life and protection of property, improving the efficiency and sustainability of buildings, rationalizing water and energy consumption, and regulating the professional relationship between practitioners in the building and construction sector.

The Municipality stressed the importance of the building code. The importance of the Saudi Building Code in following the latest methods and techniques in its application to reach advanced cities and a healthy environment that serves its residents, within the scope of cities that have become the main engine of progress and economic and cultural prosperity.

The importance of the Saudi Building Code is highlighted in its application.